3.2 Inverter Wire Box and Connection Points
Name
Description
2. PV
3. Battery
1. DC Switch
7. Bluetooth Antenna
4. Solis Logger
5. AC-Backup
6. AC-Grid
8. COM1/COM2
9. Rapid Shutdown
Initiation Switch
10. AC Bypass Switch
Conduit for PV conductors should be connected here
Conduit for battery conductors should be connected here
This is the DC disconnect switch for the PV
Rapid shutdown initiation switch to power off the internal transmitter and module level
rapid shutdown receivers
Solis data logger gets connected here - only USB versions of the loggers will work
Conduit for AC conductors to backup loads panel should be connected here
Conduit for AC conductors to the main service panel should be connected here
Extends the range of the inverter Bluetooth signal
RS 485 and CAN communication cables should go through these - use cable glands
Position 0 - Backup loads are disconnected - no AC voltage to the backup panel
Position 1 - Backup loads are supported by the main service panel (Bypass)
Position 2 - Backup loads are supported by the Backup circuit of the inverter
9
6. AC Grid
5. AC-Backup
4. Solis Logger
3. Battery
1.DC Switch
7.Bluetooth
Antenna
2. PV
8. COM
10. AC Bypass
Switch
9.Rapid
Shutdown
Switch
3. Overview
1.DC Switch
9.Rapid
Shutdown
Switch
10. AC Bypass
Switch
4. Solis Logger
6. AC Grid
5. AC-Backup
3. Battery
2. PV
8. COM
7.Bluetooth
Antenna