5. Operation
Monthly Energy
Main interface
information
settings
advanced info.
advanced settings
UP/DOWN
UP/DOWN
UP/DOWN
Pressing the ENTER
key to switch
to the submenu
Pressing the ESC
key calls back
the previous menu
main menu
Figure 5.1 Operation Overview
ESC
ESC
ENTER
5.1 Initial Display
When powering up the inverter for the first time, it is required to set the language.
Press "ENT" to select.
Figure 5.2 Set Language
Settings
Set
Language
2015-02-23 19 35
English
中文
Y E S
=
< E N T >
N O
=
< E S C >
5. Operation
After setting the language, press "ESC" to access the main page.
Figure 5.3 Main Page
KWH
2
.
526
Solar Power: When solar power is generated
,
an arrow
indicates the direction of the power flow and the value is shown
above the arrow.
Battery: When the battery is connected successfully, it will
display "CAN OK",meanwhile,battery SOC, arrow and value
of power flow is shown. Otherwise, it will display "CAN Fail".
Non-Critical Loads: Loads connected to the AC Grid port which
will shutdown if the grid is in malfunction.
KWH
2
.
526
Smart Meter: When the smart meter is connected successfully,
it will display "RS485 OK", otherwise "RS485 Fail".
Critical Loads: Loads connected to the AC Backup port which will
be supported by battery and solar even if the grid is in malfunction.
Grid: The arrow and value indicate the export/import power of
the hybrid system.
0.00kW
0.00kW
0.00kW
0.00kW
On the main page,
Press "ESC" : View the yield data on a monthly bar charts.
Then use "UP" and "DOWN"
to change the date and "ENT" to move the cursor.
Press "UP" or "DOWN": View different status on the top left of the main page.
Press "ENT": Enter the main menu.
.24.
.25.