![Solid Build BRIGHTON Assembly Instructions Manual Download Page 39](http://html.mh-extra.com/html/solid-build/brighton/brighton_assembly-instructions-manual_1315350039.webp)
1. Install the floorboards (POS. 25 & POS. 26). You can start from either end. Install
the floorboards
beveled or square
side up. Make sure to
keep it consistent,
though!
2. Nail them into the floor joists through the grooves to hide the nails.
3. The last floorboard may need to be trimmed. Measure the distance left to the wall
and cut off the remainder.
4. Install the baseboards (POS. 27) wide-side facing the floor around the perimeter of
the shed.
5. Where the baseboard does not fit under the window or door frame, measure and cut
it into smaller pieces to fit between the frame and wall.
NOTE
! A gap between wall and floor around the perimeter is there to allow for
ventilation and to allow "breathing room" for wood. It will be covered with baseboards.
TRICK
If you notice any warped boards, don't feel discouraged to use them, they
will
straighten
out as you nail down one end and slide the warped end to meet the rest of the floor. Use
them throughout the floor, do not leave them for the last.
Stand or kneel on the board you are working with to help guide it into place.
STEP 15 - INSTALL FLOOR AND BASEBOARDS
39
BRIGHTOLN 10 x 10 ft, 1
3
/
8
"