1.
Return the starter boards (POS.2 & POS. 3) on the floor joists, and
double-check
that starters are at right angles.
2.
Fasten the starter boards to the floor joists using the wood screws provided. To
anchor your shed, fasten each starter wall board using 3
long 3
1
/
2
" wood screws to
the floor joists.
3.
Front and back start boards (POS. 2) are fastened at the joint and center through
the tongue.
Predrilling is necessary when
screwing at the joint as the wood is
thinner and may split upon screw insertion.
4.
Side starter wall board (POS. 3) fixing is OPTIONAL. You may fasten the side
wall boards to the floor joists or foundation using 3 extra-long 5
1
/
2
" wood screws.
Predrill, and use a driver-drill in this case.
TIP
. For added support, you may install a plywood subfloor on the floor joists or wood
foundation before fastening the starter boards.
From there on, you
won't need screws for the rest of the wall assembly
.
TRICK
To ensure the starter row is square (at right angles), use a piece of factory-cut plywood or
another large item with at least one 90-degree corner. Place this item in the corner of the
starter rectangle to help align the boards, mark the proper location and have your build
partner align the opposite corner while you are holding the first one.
This may be easier than measuring cross distances between corners when the foundation
outline is not clearly defined.
STEP 2 & 3 - ANCHOR STARTER ROW
16
BRIGHTOLN 10 x 10 ft, 1
3
/
8
"