1. Mount the prefabricated
gables
(POS. 13 & POS. 14) above top wall-boards. Front
gable (POS. 13) has a cut-out around the door frame.
2. Fasten gables using four 2
3
/
4
" screws, 1 at each side at the crossing of the walls.
3. Place the roof beams (POS. 15 & POS. 16). The ridge (center) beam (POS. 16) is
triangle-shaped at the top.
4. Fasten the roof beams to gables using 2
3
/
4
" wood screws. It is
optional but
helpful
in windy areas.
NOTE
. Make sure the front gable slides well into the door frame. If it doesn't, check if
the screws holding the door frame are crewed all the way in.
TRICK
If the gable is not flush with the top wall boards, use the mallet from the bottom of the
paddles from top to bottom to lift the crossing boards one by one until it becomes even.
1/4" difference is acceptable and will disappear once the structure settles. Evening it out
is helpful when installing the roof boards so they can lay flat at this board junction.
STEP 7 - ASSEMBLE GABLES AND ROOF BEAMS