Manuel HM acoustic housing
7
5.3
Emergency procedures
5.3.1
Fire fighting
Strictly adhere to all statutory fire safety regulations. The insulation foam has a fire behaviour
according norm.
6
Product delivery
Upon delivery, inspect the product for damage caused during transport and ensure the delivery is
complete. Record any damage or missing parts on the transport documents. Complaints regarding
obvious transport damage or incomplete deliveries cannot be considered if made too late.
On the construction site, protect the unit against dirt, impact and the elements.
6.1
Uploading / transport to location of installation
This unit is shipped in parts on a pallet. For unloading, lift the unit by the pallet. Too short forks can
damage the acoustic housing.
Risk of serious injury or damage to property from dropping loads. Observe the safety instructions of
the transport equipment and lifting gear.
Do not climb onto the unit.