40
on
off
RS485-2
RS485-1
Figure 37: RS485 Termination Jumper
The Termination Jumper is shown in the diagram on the left. To enable
termination place the jumper over the two upper pins next to the “on” label
on the board. To disable termination place the jumper in the off position on
the lower two pins.
J1
J2
Figure 38: RS485 connector pin-out
RS485 connector pin-out
RS485 data format
Baud Rate
Programmable, 2400/4800/9600/19200/38400, default = 19200
Data Bit
8
Stop Bit
1
Parity
N/A
5
Commissioning the PV system
Read all of these instructions, cautions, and warnings for the
Solectria PVI inverter and associated PV array documentation.
WARNING!
AVERTISSEMENT!
WARNING!
AVERTISSEMENT!
Installation and commissioning must be performed by a licensed
electrician in accordance with local, state, and
National Electrical Code ANSI/NFPA 70 requirements.
Contact Solectria for available 485 cables for daisy-chaining 485 on multimple inverters or con-
necting to SolrenView monitoring logger.