27
Chapter 3:
Chapter 3:
Chapter 3:
Chapter 3:
Preparing for Installation
Preparing for Installation
Preparing for Installation
Preparing for Installation
Since the Skyway bridge/router is a ruggedized device installed outside the building,
Solectek recommends spending some time planning the installation and testing the
configuration before permanently mounting the units.
This chapter contains the following information:
Before Installing ................................................................ 28
Safety Considerations ....................................................... 29
Pre-installation Procedures ................................................ 30
Site Considerations..................................................... 30
Bench Test ................................................................. 32
Summary of Contents for skyway series
Page 12: ...x ...
Page 26: ...xxiv Index 229 ...
Page 52: ...26 ...
Page 66: ...40 ...
Page 82: ...56 ...
Page 150: ...124 ...
Page 196: ...Status Summary 170 ...
Page 214: ...188 ...
Page 218: ...192 ...
Page 222: ...196 ...
Page 238: ...212 ...
Page 254: ...228 ...