DISPENSER INSTALLATION INSTRUCTION
1. Install Directly into the Wall – Use Cover Panel
Hardware provided with the dispenser:
o
Key
o
(4) Screws #10 x 1”L, Phillips Head
o
(4) Wall Anchors
Tools and materials required (not provided):
-
Stud Finder
-
Pencil
-
Tape Measure
-
Level
-
Knife or Saw (to cut drywall)
-
Powered Screwdriver with Phillips Head and 1/4" Hex Head Drive
-
Cotton Gloves
-
(2) Studs 2” x 4” x 12”L
-
(6) Screws #10 x 1 1/2”L, Phillips Head
Step 1: Dispenser Location
Determine the location of the dispenser to be mounted. Ensure there will be
no interference during the opening and closing of the cover or when paper is
dispensed at the bottom of the dispenser.
Step 2: Studs’ Location
Use a Stud Finder to find the location of the two studs on both sides of the
area where the dispenser will be mounted. Mark the locations of the studs.
Step 3: Cut the Opening on Drywall
Knowing the studs’ location, the dispenser should be mounted roughly in the
middle, between the two studs. The bottom of the dispenser should be 48
inches from the floor.
To install the dispenser into the wall, it is required to cut an opening of
10 5/8” W x 15 1/8”L on the drywall.
Recommend to use a pencil outlining the opening before cutting into the
drywall:
-
Using a tape measure, place a mark of 48” from the floor. Then use a
level to draw a horizontal line from the mark. This is the bottom line
of the opening.
-
Using a tape measure, place a mark of 15 1/8” from the bottom line
drawn from the last step. Then use a level to draw a horizontal line
from the mark. This is the top line of the opening.
-
Use the level to draw two vertical lines to connect the top and
bottom lines. These two lines should be 10 5/8” apart from each
other. These two lines should be roughly in the middle, between the
two studs.
Now use a knife or a saw to carefully cut the opening out of the drywall.
See Figure 1 for more details.
2
10 5/8"
15 1
/8"
48
"
Floor
Figure 1.