The Energy Manager option is used for setting power export limitation, as
described in the
Export Limitation Application Note, available on the
https://www.solaredge.com/sites/default/files/feed-
in_limitation_application_note.pdf
Device Manager
From the
Commissioning
menu, select
Device Manager
to configure various system
Smart Energy Management devices.
For more information refer to
https://www.solaredge.com/products/device-control#/
Maintenance
From the
Commissioning
menu, select
Maintenance
to configure various
system settings, as described below.
Date and Time: Set the internal real-time clock. If connected to the monitoring
platform, the date and time are set automatically and only time zone should be set.
Reset Counters: Resets the accumulated energy counters that are sent to the
monitoring platform.
Factory Reset: Performs a general reset to the default device settings.
Firmware Upgrade: Perform a software upgrade.
Diagnostics: Displays the Isolation status and power optimiser status
screens. Refer to
https://www.solaredge.com/sites/default/files/application_note_
isolation_fault_troubleshooting.pdf
.
Activate Standby Mode
: Enables/disables Standby Mode - for remote
commissioning.
Board Replacement
: Backs up and restores the system parameters, including
energy counters; Used during board replacement according to the instructions
supplied with replacement kits.
Information
From the
Commissioning
menu, select
Information
to view and set various system
settings, as described below.
Chapter 5: Activating, Commissioning and Configuring the System
40