
17
MQSW Wall Mount Surround Dimensions
Installation of MQ Wall Mount Surrounds
MQ33SWF
MQ36SWF
A
35-5/16” 37-5/32”
B
45-13/16” 50-5/16”
C
28-3/8” 32-15/16”
D
17-13/16” 19-5/8”
E
8-3/4” 8-3/4”
F
8-3/4” 8-3/4”
G
8-3/4” 8-3/4”
H
1” 1”
I
1-3/16” 1-3/16”
1. Set Surround Lip on CVCK Ledge and ensure that it is securely in place.
2. Swing the upper portion of the Surround so that the Surround Ledge is resting on top of the
CVCK Deflector Lip.
3. Align the Mounting Screw Holes and fasten the Surround in place with the supplied screws.
4. Attach optional decorative bands as desire.
5. To remove, simply reverse these steps.