INSTALLATION CHECK LIST
Prior to handover, complete the installation check list:
1.
System is installed as per the installation instructions ............................................................................................ [ ]
2.
Water is connected, turned on and solar storage tank is filled ............................................................................... [ ]
3.
Closed circuit is filled with correct concentration of fluid and has been commissioned ........................................ [ ]
4.
All mechanical fixings are secured ......................................................................................................................... [ ]
5.
Collector rail has a rise of 12-15 mm per collector on the hot outlet side of the solar collectors
if installed directly onto the roof ............................................................................................................................ [ ]
6.
Collector rail is either horizontal or higher on the hot outlet side of the solar collectors if part of a frame ........... [ ]
7.
In the case of a remote installation ensure a minimum DN20 or 22mm pipe is used for the solar cold
and solar hot pipe, and the pipes have a continuous upwards slope towards the tank from the collectors ............ .[ ]
8.
Protective plastic film removed from tank (if fitted) .............................................................................................. [ ]
9.
Covers removed from collectors ............................................................................................................................ [ ]
10.
Pipe, conduit penetrations through the roof have been sealed correctly ................................................................. [ ]
11.
Roof tiles put back into position ............................................................................................................................. [ ]
12.
Roof flashing watertight ......................................................................................................................................... [ ]
13.
System checked for water (and heating fluid) leaks and pipe connections are correctly tightened ........................ [ ]
14.
Cold and hot water piping checked for water leaks ................................................................................................ [ ]
15.
Drain pipes free of any obstruction ........................................................................................................................ [ ]
16.
All pipe work clipped where necessary .................................................................................................................. [ ]
17.
Electrical power to the booster is switched on (if required) ................................................................................... [ ]
18.
Operation of booster checked ................................................................................................................................. [ ]
19.
Air bled from taps .................................................................................................................................................. [ ]
20.
Instruct the householder on the water heater system use and leave manual with the householder ......................... [ ]
Summary of Contents for 151J
Page 45: ...45 INSTALLATION DIAGRAMS MODELS 151L 181L 151L 181L ...
Page 47: ...47 INSTALLATION DIAGRAMS MODELS 302L 303L 302L 303L ...
Page 51: ...CONNECTION DETAILS 51 With Pitch Tiled Roof Mounting ...
Page 58: ...58 This page is intentionally blank ...