![Softing BC-600-PB Manual Download Page 20](http://html1.mh-extra.com/html/softing/bc-600-pb/bc-600-pb_manual_1312416020.webp)
Connection to PROFIBUS
Manual
Page 20
© 2013
7.3
Connection for Testing a Live Bus
To test a live PROFIBUS with the PROFIBUS Tester 4 during operation,
appropriate connection possibilities have to be provided. If no suitable
connection points are available in the existing installation, it is recommended
to install them during system shutdown. This will make future maintenance
work much easier.
Attention: When installing additional connection points, you divide the
bus. Before doing so, you therefore need to shut down the PLC and
all the devices connected to the PROFIBUS; in other words, you need
to shut down the whole installation.
Attention: For testing on live systems the optional D-sub adapter
cable BC-600-PB-CB-DSUB-1 with reduced influence on bus
operation is highly recommended! See page
9
.