SOFAR 7K~10.5KTLM-G3
User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 2 -
Qualified persons
The customer must make sure the operator has the necessary skill and training to
do his/her job.Staff in charge of using and maintaining the equipment must be
skilled,aware and mature for the described tasks and must have the reliability to
correctly interpret what is described in the manual. For safety reason only a
qualified electrician, who has received training and / or has demonstrated skills
and knowledge in construction and in operation of this unit, can install this
inverter. Shenzhen SOFARSOLAR Co., Ltd does not take any responsibility for
the property destruction and personal injury because of any incorrect use.
Installation requirements
Please install inverter according to the following section. Fix the inverter on an
appropriate objects with enough load bearing capacity (such as walls, PV racks
etc.), and ensure that inverter is vertical placed. Choose a place suitable for
installing electrical devices. And assure there is enough fire exit space,
convenient for maintenance. Maintain proper ventilation to ensure enough air
cycle to cool the inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or find
any visible damage, please immediately notice the responsible transportation
company. You can ask solar equipment installation contractor or Shenzhen
SOFARSOLAR Co.Ltd for help if necessary.