Minimum installation distance for single sofar 30~40KTL
Determine an appropriate position for installing the Sofar 30~40KTL.
Comply with the following requirements when determining the installation position:
Tool
Model
Function
0-180º
Cable cutter
Hexagon socket
Crimping tools
Vacuum cleaner
Multimeter
Marker
Level
ESD gloves
Safety goggles
Anti-dust respirator
Used to measure distances
Used to mark signs
Used to ensure that the rear panel is
properly installed
Operators wear ESD gloves when
installing equipment.
Punch operator wearing
Punch operator wearing
Used to cut power cables
M6 use to uninstall and install the front
top cover and down cover.
M4 use to install the rear panel on the
sofar 30~40KTL.
Used to crimp power cables
Used to clean up dusts after drilling
holes
Used to check grounding
N/A
M4,M6
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3.4 Determining the Installation Position
Figure 3-2 Installation position requirements
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
19
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
20
User manual
User manual
Installation
Installation
R
45
J
2PCS
max 15
º
Sofar 30K~40KTL
Sofar 30K~40KTL
Document Version 1.0(2015.08.06)
Document Version 1.0(2015.08.06)
Компания
«
Реалсолар
»,
Санкт
-
Петербург
,
Октябрьская
наб
.,
д
. 104,
к
. 1,
лит
.
П
www.realsolar.ru +7911-921-52-96