After unpacking the
, check whether deliverables are intact and complete. If any
damage is found or any component is missed, contact the dealer.
inverter
Installation
3
3.1 Installation Process
3.1 Installation Process
Figure3-1 Installation flowchart
Start
Outlines of this chapter
This topic describes how to install the Sofar 30~40KTL.
Installation notes
Caution
Danger
Attention
Do not install the Sofar 30~40KTL on flammable building materials.
Do not store the Sofar 30~40KTL in areas with flammable or explosive
materials.
Do not install the Sofar 30~40KTL in places prone to body contact because the
Sofar 30~40KTL shelf and heat sinks become hot during the Sofar 30~40KTL
operation.
Take the Sofar 30~40KTL weight into consideration when transporting and
moving the Sofar 30~40KTL.
Install the Sofar 30~40KTL in an appropriate position and surface.
Assign at least two persons to install the Sofar 30~40KTL.
This topic describes the process for installing the Sofar 30~40KTL.
3.2 Checking Before Installation
Before unpacking, check that the packing materials are intact. After unpacking, check that the
deliverables are complete and intact.
3.3 Tools
Prepare tools required for installation and electrical connections.
3.4 Determining the Installation Position
Determine an appropriate position for installing the
.
Sofar 30~40KTL
3.5 Moving the Sofar 30~40KTL
This topic describes how to move the
to the installation position horizontally.
Sofar 30~40KTL
3.6 Installing the Sofar 30~40KTL
Before installing the
, secure the shipped rear panel to the wall. Then secure
the Sofar 30~40KTL to the rear panel by using hexagon screws.
Sofar 30~40KTL
Check before
installation
Prepare installation
tools
Determine the
installation positio
Moving the
inverter
Installation the rear
panel
Installation the
inverter
End
3.2 Checking Before Installation
Checking Outer Packing Materials
Checking Deliverables
Packing materials and components may be damaged during transportation. Therefore, check
the outer packing materials before installing the inverter. Checking the surface of packing
materials for damage, such as holes and cracks. If any damage is found, do not unpack the
inverter and contact the dealer as soon as possible. You are advised to remove the packing
materials within 24 hours before installing the inverter.
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
15
All rights reserved
Shenzhen SOFARSOLAR Co ., Ltd.
C
16
User manual
User manual
Installation
Installation
Sofar 30K~40KTL
Sofar 30K~40KTL
Document Version 1.0(2015.08.06)
Document Version 1.0(2015.08.06)
Компания
«
Реалсолар
»,
Санкт
-
Петербург
,
Октябрьская
наб
.,
д
. 104,
к
. 1,
лит
.
П
www.realsolar.ru +7911-921-52-96