![Sofar solar 100KTL User Manual Download Page 25](http://html.mh-extra.com/html/sofar-solar/100ktl/100ktl_user-manual_1311963025.webp)
75-136KTL
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 21 -
7
M6
M6 use to uninstall and install
the front top cover and down
cover
8
Torque wrench Connect AC connector
9
Crimping Tool
Use to crimp cable on grid
side, load side and CT
extensive cable
10
Multimeter
Check grounding cable, PV
positive and negative pole
11
Marker
Mark signs
12
Measuring
Tape
Measure distance
13
Level
Ensure the rear panel is
properly installed
14
ESD gloves
Installer wear when installing
product