![Snowflake SBU15HL Service Manual Download Page 45](http://html.mh-extra.com/html/snowflake/sbu15hl/sbu15hl_service-manual_1309837045.webp)
45
765042231 Rev.001
r20
0
1
- - - -
1
1
memorisation of the quick modification value
during the "On" status before starting the
operating cycle
0 = no (on start-up of the successive
same cycle, the values established
with parameters r7 and r3 or those
establishes with r4 and r8 will be re-
proposed)
1 = yes (on start-up of the successive
same cycle the rapidly modified
values will be re-proposed before
starting the previous same cycle)
r21
0
1
- - - -
0
0
modality the operating cycle is started time
controller rather than time controlled
0 = automatic (or through the test
regarding correct insertion of the
needle probe)
1 = by hand (or pressing and releasing
the BLAST CHILLING or DEEP
FREEZING key)
r22
0
1
- - - -
0
0
modality to start pre-cooling
0 = automatic (or pressing the BLAST
CHILLING key 1 s)
1 = both automatic (or passing from the
"stand-by" status to the "on", then
switching on the device) and by hand
(or pressing the BLAST CHILLING key
1 s)
r23 0 50
s
5
5
duration of the buzzer activation to signal
the verification test for the correct insertion
of the needle probe will not have been
completed successfully
Par.
Min.
Max.
Unit
EVX803..02
SBU 15
EVX803..01
SBU 20/40
Compressor protections
C0 0 240 min
0
0
minimum time between restoring the power
supply after a power cut, occurring during an
operating cycle and compressor switch-on
C1 0 240 min
3
3
minimum time between two consecutive
compressor switch-ons (3)
C2 0 240 min
2
2
minimum time between compressor switch-
off and successive switch-on (3)