r14 10 100
%
60
60
duration of the time-controlled hard blast
chilling phase (intended as a percentage of
the value established with parameter r1);
also duration of the time-controlled soft deep
freezing phase (intended as a percentage of
the value established with parameter r2)
r15 -50.0 99.0 °C/°F
(1)
70.0
70.0
temperature below which the count of the
maximum temperature-controlled blast
chilling and maximum temperature-
controlled deep freezing is started
(temperature detected by the needle probe)
r16
0
2
- - - -
1
1
type of operating cycle that can be selected
0 = blast chilling and storage
1 = blast chilling and storage or deep
freezing and storage
2 = deep freezing and storage
r17 0.0 99.0 °C/°F
(1)
7.0
7.0
"temperature detected by the needle probe
- cabinet temperature" minimum difference
such to consider the first phase of the test to
verify correct insertion of the needle probe
completed successfully (consider the
difference without sign)
0.0
= the test will not be performed
(neither first or second phase)
r18 1 99
s
56
56
duration of the second phase of the test for
verification of correct insertion of the needle
probe
r19
0
1
- - - -
0
0
quick modification value during the "On"
status before starting the operating cycle
0 = work set-point during blast chilling or
during deep freezing
1 = blast chilling or deep freezing end