background image

PUSH PRO -0120843

17

Daily Preventative Maintenance Checklist

 

Preventative Maintenance Report

 

Date: ____________________________________
Owner: ___________________________________
Model No:  ________________________________

Serial No: _________________________________
Serviced By:  ______________________________

Daily Preventative Maintenance Checklist

Item

Inspect For

 

Y N

 

R

 

Operator’s Manual 

In manual holder, all pages readable and intact 

Electrical System

Battery terminals 

Clean, connectors tight

Battery charge indicator

Proper operation 

Battery charger

Proper operation 

Cables and wiring harness

No wear or physical damage

Hydraulic System

Fluid level  

Between full and add marks with platform 

stowed 

Hoses, tubes and fittings

No leaks, all fittings tight

 

 

Castors

Good condition, no damage/smooth movement

Manual Brakes

Proper operation, no damage or deformation

Lower Control Station

Operating controls

Proper operation

Emergency stop

Shuts off lower controls/proper operation

Lowering alarm and interrupt

Sounds when platform lowers/proper operation 

Emergency Lowering

 

Proper operation

 

Safety Prop

No damage or deformation

Structures

Weldments – Scissors, chassis, steps, 

platform, etc. 

Welds intact, no damage or deformation 

Platform slide rollers

 

In place, no damage or deformation 

Fasteners

In place, tight, and no damage

Scissor and Cylinder pins

Securly in place, no damage or corrosion

Upper Control Station

Guardrail system

 

Welds intact, no damage or deformation
All fasteners in place, no loose or missing parts

Platform floor 

No damage or deformation

 

Clean to prevent slip and fall hazards

Lanyard anchors

In place, no deformation or damage

Entry gate

 

Proper operation, no damage or deformation

 

Operating controls

Proper operation/raise and lower

Lowering delay

Proper operation, limit switch delays lowering

Emergency stop

Shuts off upper controls

Operation and Safety Decals 

In place and readable

Maintenance Table Key: Y = Yes/Acceptable, N = No/Not Acceptable, R = Repaired/Acceptable

 

Summary of Contents for S3006P

Page 1: ...OPERATORS MANUAL Part Number 514690 000 EN S3008P sn 01 000800 01 00231 S3010P sn 01 000500 01 00559 S3006P sn 01 000500 01 00059 S3210P sn 01 000000 01 00001 January 2020 Original Instructions...

Page 2: ......

Page 3: ...9 Platform Raise Lower Buttons 9 Pre Operation Safety Inspection 10 System Function Inspection 10 Operation 12 Preparing for Operation 12 Lower Controls 12 Upper Controls 12 Platform 13 Raising and L...

Page 4: ...42 EC This machinery also conforms to the following Directives EMC Directive 2014 30 EU The following standards have been used EN 12100 2010 EN 280 2013 A1 2015 EN 60204 1 2018 The machinery has been...

Page 5: ...rations depending upon platform occupancy rating see operators manual decals Type 3 Harness attachment point Type 3 is rated for one lanyard attachment per loop as shown in the illustrations depending...

Page 6: ...otice boards etc to the platform as this will increase wind loading IN CASE OF EMERGENCY push EMERGENCY STOP switch to deactivate all powered functions IF ALARM SOUNDS while platform is elevated STOP...

Page 7: ...PUSH PRO 0120843 5...

Page 8: ...artsinformation be sure to include the MODEL and SERIAL NUMBERS from the equipment nameplate Should the nameplate be missing the SERIAL NUMBER is also stamped on the front of the chassis Component Ide...

Page 9: ...ol button is pressed to lower the platform the alarm emits a loud beeping sound to warn personnel in the work area to stand clear Danger Pinch points exist on the scissors structure Death or serious i...

Page 10: ...d on the upper control panel in the platform Lower Controls The lower controls refer to Figure 2 are located on the right side of the chassis The following are located on the lower control panel Emerg...

Page 11: ...e emergency stop is a two position red push button on the right side of the upper control panel Push the button inward to disconnect power from all control circuits at the upper controls Twist the but...

Page 12: ...Check weekly that the fluid level in the batteries is correct See Battery Maintenance on page 15 4 Verify that the batteries are charged daily 5 Check daily that the AC extension cord has been disconn...

Page 13: ...on button inward Test each machine function from the lower control station refer to Figure 2 6 Test the emergency lowering system for proper operation 7 Push the Lower Control Emergency Stop Button to...

Page 14: ...rm Danger The aerial platform can tip over if it becomes unstable Death or serious injury will result from a tip over accident Do not exceed the capacity values indicated on the platform rating placar...

Page 15: ...elease the controls wait for three seconds then operate the controls to lower again The allarm will sound the beacon will flash and there will be a 1 5 second delay before lowering begins Any re leasi...

Page 16: ...dure to lift the aerial platform with a forklift 1 Properly stow the aerial platform 2 Engage the brakes on both of the rear wheels 3 Remove all personnel tools materials or other loose objects from t...

Page 17: ...y from the battery Always wear safety glasses when working near the battery Battery fluid is highly corrosive Thoroughly rinse away any spilled fluid with clean water Always replace the battery with a...

Page 18: ...ge drops off 9 Slide the component tray open to access the battery Remove the caps from the battery 10 Visually check the battery fluid level making sure the level is within 6 mm of the bottom of the...

Page 19: ...erating controls Proper operation Emergency stop Shuts off lower controls proper operation Lowering alarm and interrupt Sounds when platform lowers proper operation Emergency Lowering Proper operation...

Page 20: ...e to side 1 5 degrees Front to rear 2 degrees Tires Nonmarking solid rubber Electrical System Voltage 12 V DC negative chassis ground Source One 12 V 105 amp hour battery Fluid recommended distilled w...

Page 21: ...e to side 1 5 degrees Front to rear 2 degrees Tires Nonmarking solid rubber Electrical System Voltage 12 V DC negative chassis ground Source One 12 V 105 amp hour battery Fluid recommended distilled w...

Page 22: ...to side 1 5 degrees Front to rear 2 degrees Tires Nonmarking solid rubber Electrical System Voltage 12 V DC negative chassis ground Source One 12 V 105 amp hour battery Fluid recommended distilled wa...

Page 23: ...to side 1 5 degrees Front to rear 2 degrees Tires Nonmarking solid rubber Electrical System Voltage 12 V DC negative chassis ground Source One 12 V 105 amp hour battery Fluid recommended distilled wa...

Page 24: ...22 PUSH PRO 0120843 Manufacturer s Address Snorkel Europe Ltd Vigo Centre Birtley Road Washington Tyne Wear NE38 9DA UK...

Page 25: ...l Distributore locale EUROPE MIDDLE EAST AFRICA ASIA PHONE 44 0 845 1550 057 FAX 44 0 845 1557 756 NORTH SOUTH AMERICA PHONE 1 785 989 3000 TOLL FREE 1 800 225 0317 FAX 1 785 989 3070 AUSTRALIA PHONE...

Reviews: