■
Classification
Group A Type 3
■
AS1418.1 Group Classification
C3
■
Commissioning Information
Commissioning of the machine consists of
performing the Pre Delivery and Inspection Report
(PDIR) satisfactorily.
This PDIR is performed by Snorkel or it's agent
before the machine is delivered.
A completed PDIR can be obtained, by request,
from the sales agent.
General Specifications