Prepare the bay by selecting the location of the lift relative to the walls. Clear area of
all packaging materials to avoid trip hazards. Draw a chalk line on the floor to
represent the center line of the bay and a second chalk line crossing at 90
°
for
locating the lift towers. Refer to
Figure 3
.
5.2
BAY LAYOUT
FIGURE 3 – BAY LAYOUT
5.3
SAFETY SHUT-OFF BAR INSTALLATION
Note: The safety shut off will disconnect the power to the power pack when an
obstruction touches the padded bar or the carriages reach their maximum
extension. The safety shut off switch is factory pre-wired. Refer to Figure 4.
Note: This procedure can be done on the floor.
1.
Attach the actuator mounting bracket (1-1378) to the crossmember using hex head
bolt 1/4” NC x 3/4” lg. bolt (6-0178), lockwasher 1/4” dia. (6-0056), and hex nut 1/4”
NC (6-0032).
2.
Attach the actuator bar assembly to the actuator mounting bracket assembly using hex
head bolt 1/4” NC x 1 1/4” lg. (6-0027), lockwasher (6-0056), and hex nut 1/4” NC
(6-0032).