23
Assembly
Step 26
Fig. 26A
Fig. 26B
Step 27
Fig. 27
Step 28
Fig. 28
Step 27:
Place Burner Heat Tents
Locate :
(3) Heat Tents
Procedure:
Refer to Fig. 27 and place (3) Heat
Tents over the Burners.
Step 28:
Place Cooking Grids
Locate :
(4) Cooking Grids
Procedure:
Refer to Fig. 28 and place (4)
Cooking Grids into their position in the Grill.
Note: the opening of the Cooking Grids
MUST be placed outside.
Step 26: Install Warming Racks
Locate:
(2) Warming Racks, and (4) M6x35
bolts
Procedure:
Tighten (4) M6x35 bolt through the Lids from
the outside and position the Warming Rack so
that the bolts is going through the wire loop on
the Warming Rack as shown as Fig. 26A and
Fig. 26B.
Insert the wire legs into the holes of the cabinet
as shown as Fig. 26C.
Fig. 26C