![Smiths Medical Level 1 NORMOFLO H-1129 Operator'S Manual Download Page 12](http://html.mh-extra.com/html/smiths-medical/level-1-normoflo-h-1129/level-1-normoflo-h-1129_operators-manual_1305994012.webp)
S E C T I O N 5
•
O u t o f t h e B o x - A s s e m b l y
Level 1
®
NORMOFLO
®
H-1129 Irrigation Fluid Warmer | Operator’s Manual
7
SECTION 5
Out of the Box-Assembly
This device must be assembled and tested by authorized Smiths Medical
personnel, an authorized distributor of Smiths Medical, or a qualified
person authorized by the institution prior to placing the device into
service.
The following steps describe how to assemble and do preliminary setup of
the Level 1
®
NORMOFLO
®
H-1129 Irrigation Fluid Warmer (Fluid
Warmer).
Step 1
Verify Components of the Fluid Warmer
Step 2
Assemble Fluid Warmer to Base
Step 3
Install the Pressure Chambers
Step 4
Attach the Fluid Bag Hanger
Step 5
To Set Up the 3-Liter (3L) Pressure Accessory
Step 6
Disinfect the Recirculating Solution Reservoir
Step 7
Preparation for Use
Step 8
Perform Electrical Safety Tests
Read through the instructions completely prior to setting up the device.
Note: After unpacking the system, recycle packaging material according to
hospital policy for recyclable materials.