EN
7
7
Hood body mounting
• Firstly, it is necessary to adjust the two
Vr-
screws of
the
11a-
brackets, at minimun (
B
).
• Hang the hood body on the two brackets
11a
.
• Connect the hood to the mains supply by means of a
bipolar switch with at least 3 mm contact gap.
• Press the “
A
”-key for one second (see Part USE) to
open the upper panel.
• Remove the metal filters.
• In order to align the hood it is necessary to adjust the
Vr-
screws from inside the hood.
• Fasten the safety screw
11
.
• Fit again the metal filters into their seats and close the
upper panel by pressing “
L
”-key for one second (see
Part USE).
• Disconnect the hood from the mains supply.
Attention: the upper panel stops if any barrier occurs in its
way during the panel opening or closing. To open the panel
it is enough to remove the barrier and press the key once
again.
( B )
11a
Vr
11
Connections
DUCTED VERSION AIR EXHAUST SYSTEM
When installing the ducted version, connect the hood to
the chimney using either a flexible or rigid pipe ø 150
or 120mm, the choice of which is left to the installer.
To install a ø 150 pipe
• To install the dumper
10
• Fix the pipe in position using sufficient pipe clamps
(not supplied).
To install a ø 120 pipe
• To install a ø 120 mm air exhaust connection, insert
the reducer flange
9
on the dumper
10
.
• Fix the pipe in position using sufficient pipe clamps
(not supplied).
• Remove any activated charcoal filters.
ø 120
ø 150
10
10
9
Summary of Contents for SHW800B
Page 1: ...Instructions Manual SHW800B ...
Page 5: ...EN 5 5 Dimensions Min 368mm Min 368mm ...
Page 14: ......
Page 15: ......
Page 16: ...991 0266 554_ver1 ...