EN
6
6
INSTALLATION
Wall drilling and bracket fixing
11a
1
1
11
12a
11
12a
3
292 292
960
X
1÷2
7.2.1
368
743
As a first step, proceed with the following drawings:
• a vertical line up to the ceiling or up to the upper limit, at the centre of the area in which the
hood is to be fitted;
• a horizontal line at a minimum 960 mm above the cooker top.
• Mark a point
(1)
on the horizontal line, 292 mm to the right of the vertical reference line.
• Repeat this operation on the other side, checking that the two marks are levelled.
• Mark a reference point
(3)
at 743 mm above the cooker top on the vertical reference line.
• Drill at the marked points
(1)
, using a ø 12 mm drill bit.
• Drill at the marked point
(3)
, using a ø 8 mm drill bit.
• Insert the bracket plugs
11a
into the holes (
1)
and tighten the screws.
• Insert plug
11
into hole
(3)
.
• Place bracket
7.2.1
on the wall, about 1-2 mm from the ceiling or from the upper limit,
aligning the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the bracket holes.
• Place the bracket
7.2.1
on the wall at X mm below the first bracket (X = height of the upper
chimney section), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the bracket holes.
• Drill ø 8 mm holes at all the marked centre points.
• Insert the wall plugs
11
in the holes.
• Fix the brackets using the
12a
screws (4,2 x 44,4) supplied with the hood.
Summary of Contents for SHW800B
Page 1: ...Instructions Manual SHW800B ...
Page 5: ...EN 5 5 Dimensions Min 368mm Min 368mm ...
Page 14: ......
Page 15: ......
Page 16: ...991 0266 554_ver1 ...