background image

Warning 

 

Design / Selection

 

 

 

3. Surge voltage suppressor 

2) If a surge protection circuit contains nonstandard diodes, such 

as Zener diodes or varistor, a residual voltage that is  in 
proportion to the protective circuit and the rated voltage  will 
remain. Therefore, take into consideration the surge  voltage 
protection of the controller.. 

In the case of diodes, the residual voltage is approximately 1 V. 

4. Surge voltage intrusion 

  With non-polar type solenoid valves, at times of sudden 

interruption of the loading power supply, such as emergency 
shutdown, surge voltage intrusion may be generated from loading 
equipment with a large capacity (power consumption),  and a 
solenoid valve in a de-energized state may switch over  (see 
Figure 1).   

When installing a breaker circuit for the loading power supply, 
consider using a solenoid valve with polarity (with polarity 
protection diode), or install a surge absorption diode between the 
loading equipment COM line and the output equipment COM line 
(see Figure 2). 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

5. Operation in low temperature condition

 

Take appropriate measures to avoid the freezing of drainage, 

moisture, etc. in low temperatures. 

-  VK300 series can be used down to -5°C. 
-  VK3000 series can be used down to -10°C. 

 

6. Mounting orientation 

Mounting orientation is unrestricted.

 

7. Initial lubrication of main valve 

Initia

l

 lubricant has already been applied to the main valve. 

 

Mounting

 

 

 
1. Operation Manual (this document) 

Install the products and operate them only after reading the 
operation manual carefully and understanding its contents. 
Also, keep the manual where it can be referred to as necessary. 

2. Ensure sufficient space for maintenance activities. 

When installing the products,  allow access for maintenance 
and inspection. 

3. Tighten threads with the proper tightening torque. 

When installing the products, follow the listed torque 
specifications. 

4. If air leakage increases or equipment does not 

operate properly, stop operation. 

Check mounting conditions when air and power supplies are 
connected. Initial function and leakage tests should be 
performed after installation. 

5. Painting and coating 

Warnings or specifications printed on or affixed to the product 
should not be erased, removed, or covered up. 
Please consult with SMC before applying paint to resinous parts, 
as this may have an adverse effect due to the solvent in the paint. 

 

Piping

 

 
 
1. Preparation before piping 

Before piping is connected, it should be thoroughly blown out 
with air (flushing) or washed to remove chips, cutting oil, and 
other debris from inside the pipe. 

2. Winding of sealant tape 

  When screwing piping or fittings 
into ports, ensure that chips from 
the pipe threads or sealing 
material do not enter the piping. 
Also, if sealant tape is used, 
leave 1 thread ridge exposed at 
the end of the threads. 

3. Connection of fittings 

When screwing fittings into valves, tighten as follows. 

(1) Follow the procedures below when installing an SMC fitting, etc. 

M5 types 

  After tightening the fitting by hand, use a wrench to tighten 

the fitting an  additional approximately 1/6 to 1/4 turn. As a 
reference value, tightening torque is 1 to 1.5 N

m. 

Note) If tightened excessively, the thread of the product may 

break or the gasket may deform. If tightened insufficiently, 
the thread of the product may become loose. In either 
case, air leakage can occur.   

(2) Follow the procedure of the manufacturer when fittings other 

than SMC is used. 

Tightening Torque for Piping   

Connection thread 

Proper tightening torque

  (

N

m)

 

Rc1/8 

3~ 5 

Caution 

Caution 

VK300/3000  Series 

Precautions for 3/5  Port Solenoid Valve  2

 

 

 

Be sure to read before handling.

 

 

- 5 - 

VK300

**

-OMH0002-C

 

Summary of Contents for VK300 series

Page 1: ...Doc No VK300 OMH0002 C PRODUCT NAME 3 5 Port Solenoid Valve MODEL Series VK300 3000 Series...

Page 2: ...ety Instructions 2 3 Design Selection 4 5 Mounting 5 Piping 5 6 Wiring 6 Lubrication 6 Air Supply 6 Operating Environment 7 Maintenance 7 Specific Product Precautions 8 12 Trouble shooting 13 14 1 VK3...

Page 3: ...when configuring the equipment 2 Only personnel with appropriate training should operate machinery and equipment The product specified here may become unsafe if handled incorrectly The assembly operat...

Page 4: ...oduct 3 Prior to using SMC products please read and understand the warranty terms and disclaimers noted in the specified catalog for the particular products 2 Vacuum pads are excluded from this 1 year...

Page 5: ...y adversely affect the performance of the valve and any nearby peripheral equipment Therefore when the total energizing time per day is expected to be longer than the total de energizing time per day...

Page 6: ...ntenance and inspection 3 Tighten threads with the proper tightening torque When installing the products follow the listed torque specifications 4 If air leakage increases or equipment does not operat...

Page 7: ...age Compressed air containing a large amount of drainage can cause the malfunction of pneumatic equipment An air dryer or water separator should be installed upstream from filters 3 Drain flushing If...

Page 8: ...ection according to the procedures indicated in the operation manual this document If handled improperly human injury and or malfunction or damage of machinery and equipment may occur 2 Removal of equ...

Page 9: ...ht with lead wire Precautions Plug a connector in or out vertically never at an angle Applicable cable O D 3 5 to 7 Reference 0 5 mm2 2 core and 3 core wires equivalent to JIS C 3306 Connector part no...

Page 10: ...rates But even in low cycle rates if energizing the valve more than once a day please consult with SMC 2 Energizing solenoid should be done at least once in 30 days 3 As a rectifier is mounted to the...

Page 11: ...1A VK300 41 2A Type 20 VV3K3 20 Body ported A port top ported Type 40 VV3K3 40 Base mounted A port bottom ported Type 42 VV3K3 42 Base mounted A port side ported Type S42 VV3K3 S42 Solenoids on the s...

Page 12: ...A Combinations of Solenoid Valve Manifold Gasket and Manifold Base Mixed Mounting of VK300 and Manifold Base of VK3000 Series Combination of Blanking Plate Assembly and Manifold Base Blanking plate as...

Page 13: ...B port bottom ported Type 41 VV5K3 41 Base mounted A B port side ported Type 42 VV5K3 42 Base mounted A B port side ported Type 21 VV5K3 21 Body ported A B port top ported Type S41 VV5K3 S41 Type S42...

Page 14: ...ge Leakage at actuator cylinder etc side Leakage Foreign matter caught in the spool valve Foreign matter caught in core of solenoid valve Worn core Low line voltage Inferior tightening of installation...

Page 15: ...Prohibited way of using the valve which is written at Precautions section in this operation manual 3 Lubrication has been stopped intermediately or lubrication was suspended temporary 4 Water splashe...

Page 16: ...rinting TZ 4 14 1 Sotokanda Chiyoda ku Tokyo 101 0021 JAPAN Tel 81 3 5207 8249 Fax 81 3 5298 5362 URL http www smcworld com Note Specifications are subject to change without prior notice and any oblig...

Reviews: