![background image](http://html1.mh-extra.com/html/smc-networks/idf11e-10-a/idf11e-10-a_operation-manual_1299704058.webp)
IDX-OM-W010
Air Dryer
14 Specification for Option T
14-4 How to connect the power and signal cable
14- 2
IDF Series
14-4 How to connect the power and signal cable
Connect the power cable and signal cable in the following procedures.
1) Take off the front panel.
2) Insert the power cable prepared by the customer into the power cord inlet (with rubber grommet)
and bring the power cable near the terminal block through the base hole.
3) Connect the power cable to the terminal.
4) Insert the signal cable prepared by the customer into the signal cord inlet (with rubber grommet)
and bring the signal cable near the terminal block.
5) Connect the signal cable to the each terminal.
6) Put back the front panel.
14-5 How to re-start the operation
The output of the abnormal signal can be stopped by turning off the switch with light. Remove the cause
of abnormal operation and leave it for 3 minutes or longer after the stopping the operation, and turn on
the switch with light to re-start.
Rear panel
You can see the terminal block when you
remove this cover.
N
L
Failure
PE:Ground
Operation
1 2 3
L,N:Power supply
PE
Front
Terminal connecting screw: M3
Crimped terminal width: 6.5mm or less
Applicable electric wire: 1.25mm
2
or more
Rubber grommet
Power supply cable entry
Rubber grommet
Signal cable outlet
To the user’s machine