IDX-OM-X004
Heatless Air Dryer
2 Transportation / Installation
2-2 Installation
2
-
3
ID Series
ID
•
Please install
Bypass circuit
with
Stop valve
when you cannot stop compress air when maintenance is
checked.(exchange of the absorbent etc.)
•
Please install it on either of the M4 screws of the IN/OUT piping when you put up the earth.
•
Please set up frozen Air Dryer on the first side when you use Z type (low dew point).
•
Please install it on the second side of Heatless type Air Dryer when you install the reducing valve. It installs on
the first side, and the dehumidification ability of the air pressure cannot be demonstrated when using it low.
2 - 2 - 4
Electric Wiring
Warning
No one but qualified person should do the wiring work.
・
・
・
・
Before wiring, you must cut the power off for safety. Do not work under any energized
conditions.
・
・
・
・
Supply power from a stable place, which is free from the effect of surge.
・
・
・
・
Ensure that a Ground Fault Circuit Interrupter(GFCI) with appropriate capacity for earth
leakage and load is used in the power supply of the product to prevent electrical shock
and burnout. See “6-1 List of specifications” for details.
・
・
・
・
Supply power for the product should meet the specifications.
・
・
・
・
The product should be grounded for safety.
・
・
・
・
Do not connect the earth to a water pipe, a gas pipe, or a lightening rod.
・
・
・
・
Do not plug too many leads into a single socket. That causes exothermic heat or fire.
・
・
・
・
Do not convert the wiring to use.
IN
OUT