background image

 

 

SECURING SHED

 

Secure your shed using Treated Timber Pegs or a Bolt Down Kit

 

TIMBER PEGS—WOODEN FLOOR

 

 

• 

The optional Duratuf Timber Peg Down Kit includes six H5 treated timber 
pegs that can be hammered into the ground and then attached to the 
Base Plate with stainless steel screws. A Smart store timber floor can 
then be fitted on top of the Base Plate  if required.

 

BOLT DOWN KIT—CONCRETE

 

 

• 

The optional Duratuf Bolt Down Kit includes 6 x galvanised 
brackets, screws and  dynabolts.

 

 

• 

Space the brackets evenly around the shed and fix to the Bottom 
Plate and the concrete slab. A 10mm masonry drill bit is required.

 

IMPORTANT—

 

CLEAN UP

 

 

REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS 

THOROUGHLY. FAILURE TO DO THIS WILL RESULT IN CORROSION AND 
COULD THEREFORE VOID THE WARRANTY

.

 

FIT PADBOLT

 

 

• 

Rivet Padbolt to door and keeper onto Door Jamb as shown.

 

14

 

YOUR DURATUF SMART STORE SHED IS NOW COMPLETE. RELAX

…...

 

FRONT BASE PLATE

 

BACK BASE PLATE

 

JOIST

 

JOIST

 

JOIST

 

FIT BACK PADBOLT

 

 

• 

Rivet back pad bolts to pad bolt supports then rivet pad bolt sup-

ports to back of small door (Top and bottom)

 

 

• 

Using 10mm drill bit, drill hole into top and bottom  timber plates

 

FITTING A SMART STORE FLOOR KIT 

(OPTIONAL)

 

 

• 

Position the Floor Joists centrally between the side Base 
Plates and skew nail each end with two 75mm nails.

 

 

• 

Check that the shed is sitting level and square . Check 
that the diagonal Bottom Plate measurements are the 
same. This ensures that the shed base is square.

 

 

• 

Place the Floor Boards in position. (You may need to cut 
the last Floor Board to the correct width using a Skill 
Saw.) Nail each Floor Board in, using two 50mm nails 
each end and two nails into each floor joist. 

 

Summary of Contents for SM3020

Page 1: ...ASSEMBLY INSTRUCTIONS SM3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...ing are the minimum requirements for cladding used in Smart store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm was...

Page 4: ...de Wall Angle 1 980m 4 Roof 2 200m 6 Door Sheet Narrow 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915m 2 Double Door Weatherstrip 1 850m 1 Barge 1 102m 4 Ridge Ca...

Page 5: ...ON QTY DIAGRAM Front Back Bottom Plates H4 Green 3 020 m 2 Front Back Top Plate H1 Red 3 020 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 45 3 0...

Page 6: ...EMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...or braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 4 and opposite ends of the braces overlap in the middle Rivet do...

Page 9: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Page 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Page 11: ...eets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the...

Page 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Page 13: ...nd use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central p...

Page 14: ...Clout predrill and nail Roof Sheet through the rib into the Top Plate b fig 2 Repeat at the front left hand IMPORTANT Use 50mm Clouts only on ribs covered by flashings shown in fig 2 Predrill holes us...

Page 15: ...ORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 14 YOUR DURATUF SMART STORE SHED IS NOW COMPLETE RELAX FRONT BASE PLATE BACK BASE PL...

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: