STEP 5:

 

 

• 

Place barge flashings on roof at end of 
shed ensuring the diagonal trimmed end 
is facing out.

 

 

• 

Rivet the Barge Flashings to the roof 
and the side wall, using four rivets on top 
of barge and four into the side (

fig.3

).

 

STEP 6:

 

 

• 

Rivet the 2 Ridge Caps together using 4 
rivets, so total flashing is 3.050m long. 
Rivet the Ridge Cap to the centre of the 
roof using 10 x rivets as shown (

fig.2

).

 

 

= Clout

 

= Screw

 

fig.1

 

Pan

 

Rib

 

fig.2

 

BOTTOM PLATE

 

 

RIDGE BEAM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 3:

 

 

• 

Ensure shed is sitting level and square.

 

 

• 

Beginning  from  the  left  hand  end  (looking  from  front) 

 

centralise the Roof sheets on the Ridge Beam. 

 

 

• 

Ensure that the Roof is tight against the Gable Wall Sheets. Screw 1 x 50mm Roofing screw through the 1st pan into 

the Ridge Beam. 

(a 

-

 fig.2).

 

 

• 

At the back left hand corner, (from front) line up the ribs on the Roof Sheet with the ribs on the Wall Sheet then using 

1 x 50mm Clout, predrill and nail Roof Sheet through the rib into the Top Plate. 

(b–

 

fig.2.)

Repeat at the front

 

left hand 

IMPORTANT

 

Use 50mm Clouts only on ribs covered by flashings, 
shown in fig.2. Predrill holes using a 3.5mm drill bit. 

 

Use Roofing Screws on all other ribs and pans. 

Ensure 

screws are not overtightened as this can damage the 
seals and cause the shed to leak.

 

STEP 4:

 

 

• 

Centralise the Roof at the other end (R/H end) with the Ridge Beam. 

 

 

• 

Using 1 x 50mm Roofing Screw, fix roof sheet though the pan, to the other end of 

Ridge Beam. 

(d–fig.2).    

 

     

 

• 

Using 2 x 50mm Clouts fix sheet  though rib to front & back Top Plates.  (

e–fig.2).  

 

 

• 

Ensure that the Ridge Beam is straight, screw roof sheets to ridge beam  beside 

each overlap, through the pan using 5 x 50mm Roofing screws. 

 

 

• 

Ensure the Front and Back Top Plates are straight. Screw the roof sheets to the 
front & back Top Plates, through the ribs, using 1 x Roofing Screw per rib. (

fig.1

).

 

STEP 7:

 

 

• 

Place spouting in position and rivet to 
Barge Flashings at each end and rivet to 
roof sheets (1 rivet per 1 sheet) 

(fig.4).

 

fig.3

 

X 4

 

X 4

 

Barge

 

Spouting

 

fig.4

 

a

 

b

 

c

 

d

 

e

 

e

 

Summary of Contents for SM3020

Page 1: ...ASSEMBLY INSTRUCTIONS SM3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...ing are the minimum requirements for cladding used in Smart store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm was...

Page 4: ...de Wall Angle 1 980m 4 Roof 2 200m 6 Door Sheet Narrow 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915m 2 Double Door Weatherstrip 1 850m 1 Barge 1 102m 4 Ridge Ca...

Page 5: ...ON QTY DIAGRAM Front Back Bottom Plates H4 Green 3 020 m 2 Front Back Top Plate H1 Red 3 020 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 45 3 0...

Page 6: ...EMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...or braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig 4 and opposite ends of the braces overlap in the middle Rivet do...

Page 9: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Page 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Page 11: ...eets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the...

Page 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Page 13: ...nd use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central p...

Page 14: ...Clout predrill and nail Roof Sheet through the rib into the Top Plate b fig 2 Repeat at the front left hand IMPORTANT Use 50mm Clouts only on ribs covered by flashings shown in fig 2 Predrill holes us...

Page 15: ...ORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 14 YOUR DURATUF SMART STORE SHED IS NOW COMPLETE RELAX FRONT BASE PLATE BACK BASE PL...

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: