background image

 

 

TOP PLATE

 

TOP PLATE

 

TOP PLATE

 

ASSEMBLE BACK PANEL

 

SELECT:

 

 

3 x 1.860 m Wall Sheets

 

1 x 1.520 m Top Plate (Red)

 

1 x 1.520 m Bottom Plate (Green)

 

36 x 30mm Galv Clouts

 

4 x Rivets

 

9

 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING;

 

 

For sheds with Raised Base Plate option only (see page 6), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

.

 

1858mm

 

BOTTOM PLATE

 

1858mm

 

15mm

 

15mm

 

BOTTOM PLATE

 

BOTTOM PLATE

 

15mm

 

15mm

 

1858mm

 

1858mm

 

STEP 1:

 

 

• 

Lay out 1 x Top Plate and 1 x Bottom Plate on a 
flat surface as shown (corner cutouts to face as 
shown). 

 

STEP 2:

 

 

• 

Place 3 x 1.860 m wall sheets on top of timber 
Plates with bottom of sheets flush with each other. 

 

 

• 

Rivet the sheets together on overlaps as shown

.

 

STEP 3:

 

 

• 

Nail the wall sheets to the Top Plate at each end making sure 
that the top of the sheets are flush with the top of the Top 
Plate and that the sides of the wall sheets overhang the Top 
Plate by 

15mm

 as shown.

 

 

• 

Check that the Top Plate is straight then nail wall sheets to 
the Top Plate, using two clouts per pan. 

 

STEP 4:

 

 

• 

Nail the wall sheets to the Bottom Plate at each end, 

 

     ensuring that each side of the wall sheets overhangs the                           

Bottom Plate by 

15mm

 and that the distance between 

 

     the Top and Bottom Plates is correct. (As shown)

 

 

• 

Check that the Bottom Plate is straight then nail  

 

     wall sheets to the Bottom Plate, using two clouts per pan

.

 

Standard Shed —

 

Bottom Plate will protrude below wall 

sheet by approximately 10mm. 

 

 

Raised base plate shed —

 

Wall sheet will protrude below 

the Bottom Plate by 20mm

.

 

TOP PLATE

 

Summary of Contents for SM1515

Page 1: ...ASSEMBLY INSTRUCTIONS SM1515 BASE SIZE 1 520m x 1 520m...

Page 2: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 3: ...Angle 1 905m 2 Roof 1 720m 3 Door Sheet Narrow 1 940m 2 Door Sides 1 940m 2 Door Jamb 1 980m 1 Corner Door Jamb 1 980m 1 Door Brace 1 200m 2 Barge 1 720m 2 Spouting 1 555m 1 Door Top Bottom 0 945m 2 H...

Page 4: ...TS LIST PACK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 1 520 m 2 Side Wall Top Plates H1...

Page 5: ...DE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back W...

Page 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Page 7: ...emble door as shown ensuring narrow face of flashing is on the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of...

Page 8: ...with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the t...

Page 9: ...th bottom of sheets flush with each other Rivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with...

Page 10: ...drill bit Check the distance between the top and bottom plates then use a further 2 x 30mm clouts to nail the Door Jamb Flashings to the bottom Plate Pre drill holes STEP 4 Place the door on the panel...

Page 11: ...panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel as shown Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2...

Page 12: ...x rivets per join STEP 2 Position the Roof Sheets with front overhang of 130mm at each end fig 1 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top Plates through the ribs at each cor...

Page 13: ...REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Doo...

Page 14: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Page 15: ......

Page 16: ......

Reviews: