background image

 

 

 

Please visit www.duratuf.co.nz/warranty to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group.

 

 

 

Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smartstore shed will not rust within 20 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

• 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

• 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

• 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

• 

Fastenings and fixings.

 

• 

Normal wear and tear, damage by impact or acts of God.

 

• 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

• 

Unauthorized modification of the structure, including painting of the cladding.

 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

For a chance to WIN a 

$100 Prezzy Card!

 

 

To complete the survey please visit 

 

 

www.duratuf.co.nz/customer

-

survey 

 

COMPLETE OUR CUSTOMER SURVEY

 

Summary of Contents for SM1507

Page 1: ...ASSEMBLY INSTRUCTIONS SM1507 BASE SIZE 1 520m x 0 685m...

Page 2: ...CHECK OUT OUR ASSEMBLY VIDEO...

Page 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart Store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...ont Wall Narrow Sheets 1 940 2 Roof 0 885m 3 Door Sheets 1 900m 1 Door Sides 1 900m 2 Door Jamb 1 940m 2 Door Brace 0 915m 2 Barge 0 885m 2 Spouting 1 555m 1 Door Top Bottom 0 545m 2 Hardware Pack 1 T...

Page 5: ...TS LIST PACK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 0 685 m 2 Side Wall Top Plates H1...

Page 6: ...NT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF Top Plate Back Side Wall Sheets Roof Sheets Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheet Door Jambs Front 3 4 Wall S...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...n the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends of the braces are under the door flashings as shown in fig...

Page 9: ...ther Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the...

Page 10: ...ivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides...

Page 11: ...3 5mm drill bit Check the distance between the top and bottom plates then use a further 2 x 30mm clouts to nail the Door Jamb Flashings to the bottom Plate Pre drill holes STEP 4 Place the door on the...

Page 12: ...Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring...

Page 13: ...lashings at each end and rivet to roof sheets 1 rivet per 1 sheet fig 4 STEP 2 Position the Roof Sheets with front overhang of 130mm at each end fig 1 Using 4 x 50mm Clouts predrill and nail the Roof...

Page 14: ...REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Doo...

Page 15: ......

Page 16: ...any consequential loss or damage labour or transport charges This warranty is conditional on Construction installation and maintenance being carried out as specified in the Assembly Instruction Manual...

Reviews: