Powering On the MCS
2–19
To power on the MCS, follow these steps:
Caution
An incorrect AC input voltage setting can
damage your MCS. You must verify the setting before
you power on the MCS.
1. Verify the AC input voltage setting for operation in
your country:
■
For a SmartLink 1000, the AC input voltage
switch is located on the rear of the chassis
■
For a SmartLink 2000, an autoranging power
supply determines input voltage—you do not
need to adjust settings.
2. Plug the power cord first into the MCS and then into
the wall outlet.
3. Press the
POWER
switch to
|
(on).
Every time you power on the MCS, it runs a series of
tests to verify the presence and status of the installed
and configured modules.
Note
The events log, described in the Administration
Guide, lists the results of these module load tests.
One of these events occurs:
■
When you do not have an Ethernet adapter
installed on the MCS, the MCS completes
powering on.
■
When you have an Ethernet adapter installed in
the MCS, you see a prompt on the Workplace
Shell window asking if you want to configure the
IP address.