background image

052.7150B/W Floor supp. wall lift XXL for touch screen 86 inch, 120 kg

Page 6

SmartMetals Mounting Solutions B.V. • Vlietskade 8016 • 4241 WS  ARKEL• The Netherlands  

T

 +31 (0)88 70 60 100 • 

E

 [email protected] • 

www.smartmetals.nl

A correct mounting is extremely important and this is not the responsibility of 

SmartMetals Mounting Solutions. Faulty mounting may result in injury to persons or 

damage to equipment. SmartMetals will not be responsible in any way if the product 

has been mounted incorrectly.

Mounting fittings are not included with the product for reasons of safety, since the 

properties and bearing strength of walls/ceilings are specific for each case. Suitable 

mounting fittings must be selected based on the material of the wall/ceiling. 

Obtain advice from a specialist in the field or from a specialist shop concerning the 

choice of mounting fittings. It is the responsibility of the installer to ensure that the 

wall/ceiling can support at least four times the combined weight of the screen/

projector and bracket. 

The maximum load for this product is given in these mounting 

instructions. 

The instructions for installation and use of the screen/projector must also 

be followed with respect to the location and attachment of the screen/projector. 

GB

Mounting regulations

WARNING

Eine korrekte Montage ist von größter Bedeutung, und SmartMetals Mounting 

Solutions kann dafür keine Verantwortung übernehmen. Falsche Montage kann zu 

Personen- und Sachschaden führen. SmartMetals lehnt jede Art von Verantwortung 

ab, falls das Produkt falsch montiert wird.

Aus Sicherheitsgründen wird kein Montagematerial beigefügt, da Beschaffenheit 

und Tragkraft von Wand bzw. Decke unterschiedlich sind. Das Material für die 

Montage richtet sich nach dem Material von Wand bzw. Decke.

Bei der Wahl des geeigneten Montagematerials sollten Expertise oder Fachhandel 

herangezogen werden. Der Installateur trägt die Verantwortung dafür, dass die 

Wand bzw. Decke mindestens das vierfache Gesamtgewicht von Bildschirm/

Projektor plus Halterung tragen kann. 

Maximale Belastung für dieses Produkt steht 

in dieser Montageanleitung.

 Bei der Montage müssen auch Installations- und 

Benutzungsvorschriften für den anzubringenden Bildschirm/Projektor beachtet 

werden. 

DE

Montagevorschriften

WARNUNG

Le montage doit impérativement être effectué de façon correcte et ne relève pas 

de la responsabilité de SmartMetals Mounting Solutions. Un mauvais montage peut 

occasionner des blessures corporelles et des dommages matériels. SmartMetals 

décline toute responsabilité en cas de montage incorrect de ses produits. 

Pour des raisons de sécurité, aucun matériel de montage n’est livré avec les 

produits, car la nature et la capacité de soutien des murs/plafonds varient. Le 

matériel de montage est choisi en fonction de la composition du mur/plafond.

Pour vous aider à choisir le bon matériel, consultez un expert dans ce domaine ou 

un magasin spécialisé. Il est de la responsabilité de l’installateur de veiller à ce que 

le mur/plafond puisse supporter au moins quatre fois le poids total de l’écran/vidéo-

projecteur et de son support.  

Charge max. pour ce produit, d’après l’information 

dans ce guide d’installation.

 Lors du montage, les instructions d’installation et 

d’utilisation de l’écran/vidéo-projecteur doivent elles aussi être suivies.   

FR

Règlements de montage

AVERTISSEMENT

Correcte montage is van absoluut belang en valt niet binnen de aansprakelijkheid 

van SmartMetals Mounting Solutions. Onjuiste montage kan tot persoonlijk letsel 

en materiële schade leiden. SmartMetals kan niet op wat voor manier dan ook 

aansprakelijk worden gesteld indien dit product op onjuiste wijze is gemonteerd.

Om veiligheidsredenen wordt geen montagemateriaal bijgevoegd, gezien het 

feit dat de staat en het draagvermogen van plafonds/muren individueel zijn. 

Montagemateriaal kan worden gekozen al naar gelang het materiaal van plafond/

muur.

Raadpleeg een vakspecialist voor de keus van geschikt montagemateriaal. De 

installateur moet vaststellen of het plafond/de muur minstens vier keer van het 

gecombineerde gewicht van scherm/projector en steun kan dragen. 

Maximale 

belasting voor dit product volgens de informatie in deze montagevoorschriften. 

Voor de montage moeten ook de installatie- en gebruiksvoorschriften voor het te 

monteren scherm/projector in acht worden genomen. 

NL

Montage voorschriften

WAARSCHUWING

MOUNTING REGULATIONS

Summary of Contents for 052.7150B

Page 1: ...of conformity 4 Mounting instructions 5 User manual 11 Instructions reset controlbox 14 Specification sheet 15 Contact details 16 PRODUCT MANUAL original language English DE Produkthandbuch FR Manuel...

Page 2: ...To reduce the risk of electric shock Always unplug the unit from the electrical outlet before cleaning Mechanical safety Assure installation of unit by authorized service person only Only use original...

Page 3: ...erringern Sie das Risiko eines Stromschlags Ziehen Sie vor der Reinigung immer den Netzstecker aus der Steckdose Mechanische Sicherheit Stellen Sie sicher dass die Installation des Ger ts nur von auto...

Page 4: ...isez pas Pour r duire le risque de choc lectrique D branchez toujours l appareil de la prise lectrique avant de le nettoyer S curit m canique Assurez l installation de l unit uniquement par un technic...

Page 5: ...of spuit er niet op Om het risico op elektrische schokken te verminderen Trek altijd de stekker uit het stopcontact voordat u het apparaat schoonmaakt Mechanische veiligheid Zorg ervoor dat het appar...

Page 6: ...eser Montageanleitung Bei der Montage m ssen auch Installations und Benutzungsvorschriften f r den anzubringenden Bildschirm Projektor beachtet werden DE Montagevorschriften WARNUNG Le montage doit im...

Page 7: ...igt Reparaturen ausgef hrt hat ohne die schriftliche Zustimmung von Smartmetals vorab DE Garantiebedingungen 1 SmartMetals Mounting Solutions garantit que tout produit jug d fectueux par SmartMetals d...

Page 8: ...ebrauch und hnliche Zwecke Teil 1 Allgemeine Anforderungen EN 614 1 2006 A1 2009 Sicherheit von Machinen Ergonomische Gestaltungsgrunds tze Teil 1 Begriffe und allgemeine Leits tze Arkel 28 Februar 20...

Page 9: ...rit des personnes 2 Sachez que PIEZO sera ignor pendant env 1 seconde apr s l activation du syst me lift ce qui signifie que le lift est d j en train de voyager une distance sans protection anticollis...

Page 10: ...ale et la p riode de temps pendant laquelle la puissance peut tre pr sente Dans la plupart des cas le syst me PIEZO sera conforme la directive MAIS dans certains cas il peut y avoir des exceptions ill...

Page 11: ...S ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl MOUNTING INSTRUCTIONS 1 2 3 4 5 6 7 8 9 MON 0095 11 MON 0120 10 C D B A 052 7288 MON 0095 10a M6x16 8x 10b M6 8x...

Page 12: ...L for touch screen 86 inch 120 kg Page 12 SmartMetals Mounting Solutions B V Vlietskade 8016 4241 WS ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl MOUNTING INSTR...

Page 13: ...touch screen 86 inch 120 kg Page 13 SmartMetals Mounting Solutions B V Vlietskade 8016 4241 WS ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl MOUNTING INSTRUCTIO...

Page 14: ...screen 86 inch 120 kg Page 14 SmartMetals Mounting Solutions B V Vlietskade 8016 4241 WS ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl MOUNTING INSTRUCTIONS 8 7...

Page 15: ...olutions B V Vlietskade 8016 4241 WS ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl MOUNTING INSTRUCTIONS Max 120 kg 265 lbs 11a 11b 11d 11e 4x Optional 11f 4x Op...

Page 16: ...A C3 8x 1 C1 M8 8x C2 M8 8x20x1 5 8x C3 M8x16 8x MON 0255 VESA Fixate to position Fixate to position 800 x 600 500 400 300 200 VESA 600 VESA 500 700 x 600 500 400 300 200 VESA 500 VESA 400 600 x 600...

Page 17: ...t place objects SE Varning Kl mrisk PL Uwaga Ryzyko przygniecenia NL Voorzichtig Beknellingsgevaar IT Attenzione Rischio di schiacciamento GB Caution Risk of crushing FR Attention Risque d crasement F...

Page 18: ...lug to the controlbox berpr fen Sie die Verbindung vom Netzstecker zur Controlbox V rifiez la connexion de la prise d alimentationau bo tier de commande Controleer de verbinding van de stekker naar de...

Page 19: ...655 25 112 5 5 75 147 127 5 392 5 127 5 8 5 677 5 11 SmartMetals Mounting Solutions BV Vlietskade 8016 4241 WS Arkel The Netherlands www smartmetals nl Product Floor supp wall lift XXL for touch scre...

Page 20: ...ARKEL The Netherlands T 31 0 88 70 60 100 E info smartmetals nl W www smartmetals nl Cable wire color Blue Green Blue Red White Green White Red Orange Green Orange Red Function Reference 1 Up Referen...

Reviews: