SMA Solar Technology AG
Operating manual
STP8-10-3AV-40-BE-en-12
4
Requirements for the DC Connection .................................................... 35
Assembling the DC Connectors ............................................................. 37
Connecting the PV Array........................................................................ 39
Disassembling the DC Connectors ........................................................ 42
Commissioning ......................................................................... 44
Operation ................................................................................. 49
Establishing a Direct Connection via Ethernet ...................................... 49
Establishing a direct connection via WLAN ......................................... 49
Establishing a Connection via Ethernet in the local network ............... 51
Establishing a Connection via WLAN in the Local Network ............... 52
Deactivating Grounding Conductor Monitoring...................................................... 65
Setting the Rated Residual Current of the Residual-Current Device ........................ 66
Disconnecting the Inverter from Voltage Sources ................. 69
10 Cleaning the Inverter ............................................................... 71
11 Troubleshooting........................................................................ 72
Summary of Contents for SUNNY TRIPOWER 10.0
Page 106: ...www SMA Solar com ...