SMA Solar Technology AG
Installation Guide
SB50US-80US-IUS094030
11
1 Introduction
This installation guide provides all the information needed to install, commission and operate a Sunny
Boy (SB 5000US, SB 6000US, SB 7000US, SB 8000US) grid-tied photovoltaic (PV) inverter.
1.1 Target Group
This manual is for qualified personnel. Qualified personnel has received training and has
demonstrated skills and knowledge in the construction and operation of the device. Qualified
personnel is trained to deal with the dangers and hazards involved in installing electric devices.
To help avoid problems during the installation, familiarize yourself with the installation
process by reading the entire Installation Guide before starting the installation.
WARNING!
Lethal voltages are present at various points in a PV system. For safety reasons, it is
recommended that only qualified personnel install and operate this equipment.