Table of Contents
SMA Solar Technology AG
Operating manual
SBxx-1AV-41-BE-en-12
4
Connecting the PV Array........................................................................ 40
Disassembling the DC Connectors ........................................................ 42
Commissioning ......................................................................... 45
Operation ................................................................................. 50
Establishing a Direct Connection via Ethernet ...................................... 50
Establishing a direct connection via WLAN ......................................... 50
Establishing a Connection via Ethernet in the local network ............... 52
Establishing a Connection via WLAN in the Local Network ............... 53
Deactivating Grounding Conductor Monitoring...................................................... 67
Setting the Rated Residual Current of the Residual-Current Device ........................ 67
Disconnecting the Inverter from Voltage Sources ................. 70
10 Cleaning the Inverter ............................................................... 73
11 Troubleshooting........................................................................ 74
Summary of Contents for SB3.0-1AV-41
Page 111: ......
Page 112: ...www SMA Solar com...