background image

Page 2 

 

End Nozzle Assembly Procedure 

For Boomless “Wet” Boom 

Your boom will come with the (2) end nozzle assemblies 

NOT affixed to your boom tube. Follow the instructions 

below to attach these properly to the boom tube, as 

shown. 

Assembled 
End Nozzle 

1.  Start by sliding Item 4, 3, 2 onto the boom tube 

(Item 1) as shown, leaving about 1/2” to 3/4”     

between the end of the boom tube and Item 2,  

make sure the “Long” portion of Item 3 is facing the 

nozzle end. 

2.  Slide the (complete) end nozzle assembly onto the 

stainless steel boom tube, with a somewhat 

“twisting” motion, so that the end face of the boom 

tube “butts” up against the surface face inside the 

nozzle body. 

3.  Now push the “compression olive” (Item 3) against 

O-ring (Item 2) and slide (both) into the nozzle 

body opening firmly. 

4.  Firmly tighten flynut (Item 4) onto threads of      

nozzle body. 

5.  Repeat for other side. 

 

NOTE: If water is shooting back on the boom tube, 

item 2 is not in the correct placement. 

Item 2 is shipped inside of 

the end nozzle assembly. 

Remove & place on tube.

 

15° 

End Nozzle Information 

(5275122) 

This nozzle mounting stem 

Has a ratcheting motion. 

** Each “click” of the ratcheting motion is approx. 15° ** 

For proper/optimal spray coverage, 

The nozzle must be at a 15° angle 

 

The 15° angle shown will prevent the outer 

Nozzles from overlapping with the center nozzle. 

“On/Off” Valve Positions 

Valve “Open” 

Valve “Closed” 

Service Position 

On/Off Valve Knob 

Eliminate line pressure, then pull out 

to check diaphragm condition. 

Note: The check valve & diaphragm can fall out during transport, if the 

knob is not turned to the “ON” or “OFF” position. 

Summary of Contents for 5301795

Page 1: ...NOT rotate within the grommets Alternate the tightening of the locknuts to provide even pressure on the grommet DO NOT OVER TIGHTEN the whiz locknuts as this may cause the boom tube to flatten slight...

Page 2: ...Item 3 against O ring Item 2 and slide both into the nozzle body opening firmly 4 Firmly tighten flynut Item 4 onto threads of nozzle body 5 Repeat for other side NOTE If water is shooting back on th...

Page 3: ...m nozzles Connect the lead wire to a fully charged 12 volt battery You may use either a stand alone battery or the battery on your towing vehicle Connect to the positive red terminal first then connec...

Page 4: ...valves if allowed to soak untreated for a length of time ALWAYS flush the pump as instructed after each use DO NOT allow chemicals to sit in the pump for extended times of idleness Follow the chemical...

Page 5: ...defective check valve Check for clogged strainer filter Check for cracks in the pump housing Check for empty product supply Low Pressure Low Flow Check for leaks in the discharge line Check for restr...

Page 6: ...d to a good 12 volt power source and everything on Slip the two red wires off the terminals and touch them together If the motor runs it means the pressure switch is bad and needs to be replaced If it...

Page 7: ...and before it shuts off reach down and shut the valve to the Closed position lever is perpendicular to the flow of fluid then shut off your pump Unscrew the knurled nut from the shut off valve leaving...

Page 8: ...loded View Parts List 800 UTL60BL 5301795 See DETAIL A DETAIL A Ref 1 1 Right Hand RH and Left Hand LH sides of the sprayer are determined as if you are standing behind the sprayer looking at it facin...

Page 9: ...Page 9 Exploded View Parts List Boomless Wet Boom Assembly 5275260 Center Nozzle Assembly 5275123 End Nozzle Assembly 5275122...

Page 10: ...btain warranty service under this Limited Warranty you must 1 provide written notice to Fimco Ind of the defect during the Warranty Period and within thirty 30 days after the defect becomes apparent o...

Reviews: