6 Commissioning
SMA Solar Technology AG
System Manual
SPBusiness-SH-en-10
21
Procedure:
1. Turn the DC load-break switch to
ON
.
2. Switch on the AC circuit breaker.
☑ All three LEDs light up. The start-up phase begins. All three LEDs go out again after
approximately 90 seconds.
☑ Depending on the available power, the green LED pulses or is continuously illuminated. The
inverter is feeding in.
6.7
Configuration of the storage system with LCS-Tool
6.7.1
Making the Main Configuration
The LCS-Tool is the software for the storage system. The storage system is configured via the LCS-
Tool. The installation file is stored on the USB flash drive that is contained in the battery delivery or
you can download the software at www.SMA-Solar.com.
Optional: enable Peak Load Shaving or Time of Use
Either the Peak Load Shaving function or the Time of Use can be enabled as required. It is not
possible to enable both functions simultaneously.
Procedure:
1. Install the LCS-Tool on an end device.
2. Launch the LCS-Tool.
3. If only the STORAGE-67-TS-10 was installed, from the drop-down list
Type of battery:
select
the entry
TESVOLT TS HV - 14 Modules
and, if needed, adjust the limits under
Pre-Set
Battery Limits
.
4. If the STORAGE-67-TS-10 and the Storage Extension Kit TV-10 were installed, from the drop-
down list
Type of battery:
select the entry
TESVOLT TS HV - 16 Modules
and, if needed,
adjust the limits
Pre-Set Battery Limits
.
5. If Peak Load Shaving is to be active, in the menu
Power Management
set the drop-down list
Peak Load Shaving
to
On
. Adjust the parameter for Peak Load Shaving if needed.
6. If Time of Use is to be active, in the menu
Power Management
set the drop-down list
Time
Of Use
to
On
. Adjust the parameters for Time of Use if needed.
7. Select [
Next
].
8. In the field
Battery IP
enter the IP address of the battery management system and select
[
Connect
]. The IP address can be found on the display of the battery. After the battery
management system has been connected, the software version and the serial number of the
battery management system are displayed.
9. Select [
Next
].
10. Enter the system data on the page
Plant details (optional)
. This step is not mandatory.
11. Select [
Next
].
12. Make the country settings:
• In the drop-down list
Select Country
select the country in which the storage system is
installed.