background image

4  System Overview

SMA Solar Technology AG

System Manual

SPBusiness-SH-en-10

12

4

System Overview

JANITZA

POWER METER

SUNNY PORTAL

powered by ennexOS

S

TORA

GE P

A

C

KA

GE - Business

SMA DATA

MANAGER

SMA

ENERGY METER*

*

CUSTOMER SYSTEM

SMA STORAGE SYSTEM

UTILITY

GRID

Alternating current

SMA PV SYSTEM*

Solar energy

Communication

LO

ADS

optional

Figure 2: Design of the system

Summary of Contents for STORAGE PACKAGE - BUSINESS

Page 1: ...SPBusiness SH en 10 Version 1 0 ENGLISH System Manual SMA STORAGE PACKAGE BUSINESS with SUNNY TRIPOWER STORAGE STPS60 10 ...

Page 2: ...nder any circumstances The exclusion of implied warranties may not apply in all cases under some statutes and thus the above exclusion may not apply Specifications are subject to change without notice Every attempt has been made to make this document complete accurate and up to date Readers are cautioned however that product improvements and field usage experience may cause SMA Solar Technology AG...

Page 3: ... 14 5 Installation 15 5 1 Requirements for the Installation 15 5 2 Installation Procedure 16 5 3 Installing the Power Supply Unit 16 5 4 Installing the SMA Inverter Manager 16 5 5 Installing the Janitza UMB 604 PRO 17 5 6 Installing the SMA Energy Meter 17 5 7 Installing the SMA Data Manager 17 5 8 Installing the Battery 17 5 9 Installing the Battery Inverter 17 5 10 Connecting DC Cables to the Ba...

Page 4: ... Load Shaving Function optional 22 6 7 4 Setting Time of Use optional 24 6 8 Configuring the Overall System with the SMA Data Manager 25 6 9 Registering the System in Sunny Portal powered by ennexOS 26 6 10 Deactivating the Webconnect Function of the PV Inverters in Sunny Portal powered by ennexOS optional 26 6 11 Configuring SMA SPOT in Sunny Portal powered by ennexOS optional 27 6 12 Completing ...

Page 5: ...tery manufacturer with all safety information 1 3 Content and Structure of this Document This document summarizes the specific information for the system and describes the procedure for installation and commissioning Circuitry overviews provide the basic principle of how a system must be set up and connected The latest version of this document and the comprehensive manual for installation commissi...

Page 6: ...ement for meeting a specific goal Desired result A problem that might occur Example 1 6 Typographical Elements in the Document Typography Use Example bold Messages Terminals Elements on a user interface Elements to be selected Elements to be entered Connect the insulated conductors to the terminals X703 1 to X703 6 Enter 10 in the field Minutes Connects several elements to be selected Select Setti...

Page 7: ...on content Type of information Hyperlink and QR Code SUNNY TRIPOWER STORAGE 60 Detailed manual of the battery inverter Installation manual STPS60 IA xx 12 pdf SMA INVERTER MANAGER SMA DIGITAL I O BOX LCS TOOL Detailed manual of the SMA In verter Manager and the LCS Tool Installation manual IMVIOBOX IA xx 16 pdf ...

Page 8: ...ode SMA DATA MANAGER M Detailed manual of the SMA Data Man ager Operating manual https manuals sma de EDMM 10 index html SMA ENERGY METER Detailed manual SMA Energy Meter Installation manual EMETER 20 IA de 15 pdf Please refer to the website of the battery manufacturer for further information on the batteries Tesvolt STORAGE 67 TS 10 https www tesvolt com de ...

Page 9: ...feed in and grid supplied power are only recorded with the Janitza UMG 604 PRO A Janitza UMG 604 PRO does not replace the energy meter of the electric utility company Use SMA products only in accordance with the information provided in the enclosed documentation and with the locally applicable laws regulations standards and directives Any other application may cause personal injury or property dam...

Page 10: ...Power Input V V DC9 36V DI DO Source GND 4 3 2 1 4 3 2 1 Reset SMA INVERTER MANAGER D I Figure 1 Main system components Position Quantity Designation A 1 SMA Data Manager M EDMM 10 Data logger for monitoring and control of the system The Data Manager transmits the data of the overall system to the Sunny Portal powered by ennexOS B 1 Janitza UMG 604 PRO The power analyzer UMG 604 PRO determines ele...

Page 11: ...ery modules F 1 Power supply unit CLCON PWRSUPPLY Provides the supply voltage for the SMA Data Manager the SMA Inverter Manager and the Janitza UMG 604 PRO G 1 SMA Energy Meter EMETER 20 The SMA Energy Meter determines the electrical measured values of a customer specific metering point and transmits these to the SMA Data Manager H 1 Storage Extension Kit TV 10 optional Extension kit for battery s...

Page 12: ... System Overview JANITZA POWER METER SUNNY PORTAL powered by ennexOS STORAGE PACKAGE Business SMA DATA MANAGER SMA ENERGY METER CUSTOMER SYSTEM SMA STORAGE SYSTEM UTILITY GRID Alternating current SMA PV SYSTEM Solar energy Communication LOADS optional Figure 2 Design of the system ...

Page 13: ...M VOLTAGE TRANSFORMER Type B C 160 A Grounding conductor Line conductor Neutral conductor Cabel DC 1000 V Cabel DC 1000 V Cabel DC 24 V Cabel DC 24 V LOAD with separate measuring point PV MODULS POWER SUPPLY UNIT CLCON PWRSUPPLY DISTRIBUTION BOARD GRID CONNECTION POINT with energy meter of the grid operator UTILITY GRID LOAD with separate measuring point max 100 A max 100 A Neutral conductor optio...

Page 14: ...A MANAGER M INVERTER MANAGER JANITZA UMG 604 PRO SUNNY TRIPOWER CORE1 SMA ENERGY METER SUNNY TRIPOWER STORAGE 60 STORAGE 67 TS 10 Ethernet LAN2 ROUTER SWITCH 1 INTERNET DIRECT MARKETER Ethernet LAN1 Public Internet Ripple control signal Digital signal GRID OPERATOR optional SWITCH 2 RIPPLE CONTROL RECEIVER Figure 4 Design of system communication ...

Page 15: ... digital inputs of the SMA Data Manager Router requirements DHCP should be supported if possible with MAC address binding Despite DHCP SMA Solar Technology AG recommends manually assigning an IP address to each device from the address range of the router TCP ports 123 443 and 9524 must be authorized for outgoing connections Fast Ethernet with 100 Mbit s data transfer rate IGMP protocol version 2 o...

Page 16: ...tion 5 3 page 16 2 Install the SMA Inverter Manager Section 5 4 page 16 3 Install the Janitza UMG 604 PRO Section 5 5 page 17 4 Install the SMA Energy Meter Section 5 6 page 17 5 Install the SMA Data Manager Section 5 7 page 17 6 Install the battery Section 5 8 page 17 7 Install the battery inverter Section 5 9 page 17 8 Connect the DC cables to the battery Section 5 10 page 18 9 Install the PV in...

Page 17: ... during start up The Energy Meter automatically connects to the SMA Data Manager 5 7 Installing the SMA Data Manager 1 Mount the SMA Data Manager in the distribution board and connect the voltage supply 2 Connect digital signal source e g ripple control receiver if necessary The start up process begins The SMA Data Manager is in operation when the system LED glows green 3 Connect the SMA Data Mana...

Page 18: ...nnect the DC cables to the terminals CHARGER 5 11 Installing the PV Inverter optional 1 Mount the PV inverters and make the electrical connections 2 Connect the PV inverters with each other in line topology using a network cable Connect the first or last PV inverter in the line to network switch 1 using a network cable ...

Page 19: ... the commissioning report you will need the serial numbers of all components in the system The commissioning report can be found in the download area at www SMA Solar com 6 2 Commissioning Procedure This section describes the commissioning procedure and gives an overview of the steps you must always perform in the prescribed order Configuration of the overall system The SMA Inverter Manager is the...

Page 20: ...tart up process begins 2 Select the programming mode on the device 3 Set the current and voltage converter ratio 4 Configure the Ethernet connection While doing so the device must be configured as DHCP client 6 4 Commissioning the Battery Inverter 1 Turn the DC load break switch to ON 2 Switch on the AC circuit breaker The LED On glows green and the display starts As soon as the display shows some...

Page 21: ... from the drop down list Type of battery select the entry TESVOLT TS HV 14 Modules and if needed adjust the limits under Pre Set Battery Limits 4 If the STORAGE 67 TS 10 and the Storage Extension Kit TV 10 were installed from the drop down list Type of battery select the entry TESVOLT TS HV 16 Modules and if needed adjust the limits Pre Set Battery Limits 5 If Peak Load Shaving is to be active in ...

Page 22: ...be adapted to the application during planning and commissioning The input value for Consumption Limit is interpreted by the SMA Inverter Manager as a positive value and the one for Feed in Limit as a negative value If the SMA Inverter Manager for example has to limit the grid reference power to 50 kW and charge the battery below a grid reference power of 10 kW the value 50 must be entered for Cons...

Page 23: ...l generation Feed In Limit dP D D D D D D C C C C C C C C C Discharge Setpoint 60 Charge Setpoint 40 Purchased Electricity Grid Feed In Time C C C D D D dP Charge Discharge Load peak Figure 6 Battery is charged from the utility grid Procedure 1 Select the menu Setup 2 In the menu Power Management enable the function Peak Load Shaving Otherwise the Time of Use function could be used 3 Under Peak Lo...

Page 24: ...harged with 75 kW Battery behavior during the charging period The battery will be charged at the specified charging power At night the energy will be directly drawn from the utility grid If there is unused PV energy available for charging the battery during the day the missing energy will be drawn from the utility grid Discharging and controlling the battery are blocked for the charging period Bat...

Page 25: ...eriods select the period to be defined under Seasons and adjust the corresponding settings To define the entire day with the same setting select the field All Day of the corresponding day of the week The same setting is valid for the power throughout the day To make settings for the individual periods select the desired periods of the corresponding day of the week 5 Select the period to be used un...

Page 26: ... configured as an energy meter for a customer specific measuring point 6 Disable the Modbus server for communication with the Modbus devices 7 Select the type of control Observe the specifications of the grid operator 8 Set the grid management services Observe the specifications of the grid operator 9 For direct selling with SMA SPOT under Selection of the setpoint enable the switch Direct selling...

Page 27: ...1 Select Configuration System properties 2 Activate the SMA SPOT switch and enter the data 6 12 Completing the Commissioning Report 1 Download the commissioning report Excel file from the download area at www SMA Solar com 2 Complete the commissioning report Excel file 3 E mail the completed commissioning report to EnergySystem Commissioning Reports SMA de as an Excel file Once the commissioning r...

Page 28: ...ware version Event message Mounting location and mounting height Type and number of PV modules Detailed description of the problem Battery Type Firmware version SMA Data Manager Device type Serial number Firmware version Event message Information on the ripple control receiver SMA Energy Meter Device type Serial number Firmware version SMA Inverter Manager Serial number Firmware version Janitza UM...

Page 29: ...anual SPBusiness SH en 10 29 United Kingdom SMA Solar UK Ltd Milton Keynes 44 1908 304899 SMA Online Service Center www SMA Service com Deutschland SMA Solar Technology AG Niestetal 49 561 9522 1510 SMA Online Service Center www SMA Service com ...

Page 30: ...www SMA Solar com ...

Reviews: