MC_0001

Gear Leg & Motor Bracket Installation

!

 Please refer to the graphic for special considerations relating to your model 

!

1.     Mark the tunnel centreline and the boat’s centreline. 

(NB: Install the gear leg and propeller as shown above for the thrust direction to correspond 

with the control panel. Position gear leg with the P-mark facing port and the S-mark facing starboard.)

2.     Use the gasket or template (recommended) to mark the hole centres and double-check the measurements. The centre hole MUST be placed 

using the boat centreline as shown above. 

(NB: All holes must be in-line with the tunnels’ centreline for correct installation, clearance between 

the propeller and the tunnel is minimal.)    

3.     Smooth the surface of the tunnel. A rough surface will cause possible failure/movement of the gear leg. The motor bracket must rest steadily on 

the tunnel.

4.     Drill the main centre hole followed by the two screw-holes.

5.     Place the gear leg (without the propeller) with the gasket on inside the tunnel. Place the propeller on the gear leg to ensure it is centred and 

rotates freely with the same clearance from each blade to the tunnel wall. Place top motor bracket to measure the drive shaft has come through 

the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation.

6.      Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller). 

7.     Install the top motor bracket and gear leg gently together. Use appropriate sealant to ensure that no leakages occur. 

(NB: See your sealant data 

sheet for the correct application process.)

8.     Fasten the gear leg and the motor bracket with the bolts provided. Fasten to torque as shown above.

MG_0044

PORT

STARBOARD 

S

SH 100

   FASTEN

   18 Nm

   (13.28 lb/ft)

SH 160

SH 240

   FASTEN

   33 Nm

   (24 lb/ft)

Tunnel 

centre line

Boats

centre line

Bow

Stern

1

STARBOARD

PORT

B

OW

Tunnel 

centre line

Boats

centre line

B

ØC

ØA

Measurement 

Description

mm

inch

ØA

34

1.33

B

28

1.1

ØC

9

0.35

SH 100

SH 160

SH 240

mm

inch

47

1.85

40

1.57

12

0.43

B

OW

Gasket

Ensure propeller 

turns without 

obstruction 

5

BOW

BOW

BOW

Apply MS Polymer 

sealant or equal to 

both sides of the 

gasket

Motor bracket 

IMPORTANT

Do not apply sealant to 

the holes.

6 - 7

2 - 4

8

Summary of Contents for SH100

Page 1: ...SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Hydraulic Thruster Models SH100 SH160 2746 28 2021 EN I M...

Page 2: ...SH100 185T U06 SH100 Tunnel thruster U06 Installation Manual Responsibility of the Installer 3 Thruster Measurements 4 Thruster Specifications 5 Technical Specifications 5 6 Technical Requirements Hy...

Page 3: ...tended to support experienced installers If you are not skilled in this type of work please contact professional installers for assistance If required by local regulation electrical work must be done...

Page 4: ...tion mm inch mm inch mm inch ID Internal tunnel diameter 185 7 28 215 8 46 250 9 84 H Motor Height 215 8 46 195 7 68 235 9 25 W Width 200 7 87 200 7 87 200 7 87 L Length 215 8 46 195 7 68 235 9 25 WD...

Page 5: ...available at request Propeller SH 100 SH 160 SH 240 SH 320 SH 360 5 blade skewback Q prop propeller breglass reinforced composite SH 420 SH 550 Symmetrical 4 blade kaplan propeller breglass reinforce...

Page 6: ...287 USG PSI 8 93 2494 10 30 3335 11 52 4162 U19 L min Bar 41 0 144 47 3 193 52 9 241 USG PSI 10 83 2088 12 50 2799 13 98 3495 BA19 L min Bar 40 1 145 46 3 194 51 8 242 USG PSI 10 59 2103 11 44 2813 1...

Page 7: ...on varies Motor type Port A B Port flange threads Drain port U6 1 2 BSP 1 4 BSP U8 1 2 BSP 1 4 BSP U10 3 4 BSP 1 4 BSP U11 3 4 BSP 1 4 BSP U14 3 4 BSP 1 4 BSP U16 3 4 BSP 1 4 BSP U19 3 4 BSP 1 4 BSP U...

Page 8: ...deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during ope...

Page 9: ...h of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby th...

Page 10: ...t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster in...

Page 11: ...s angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler will...

Page 12: ...el and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angled...

Page 13: ...r the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass to t...

Page 14: ...l installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible roun...

Page 15: ...llation please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE...

Page 16: ...ler on the gear leg to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor...

Page 17: ...of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread glue Loctite 243 or similar to ensure that th...

Page 18: ...all directions on the motor bracket However ensure the hose terminals are accessible for connection installation later 2 Apply seawater resistant grease on the shafts before tting the flexible couplin...

Page 19: ...shall be connected to GND and the red wire connected to 12VDC or 24VDC To reduce the risk of interference avoid routing the S Link cables close to equipment such as radio transmitters antennas or hig...

Page 20: ...ion For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REV...

Page 21: ...d lled with gear oil Correct drive direction as per control panel The bolts holding the gear house and motor bracket together are tightened correctly The bolts holding the motor to its bracket are tig...

Page 22: ...ned to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding th...

Page 23: ...23 2746 28 2021 SH 100t 160t MC_0037 Notes...

Page 24: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Page 25: ...19 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE To download your language go to www sleipnergroup com 6572 4 K e e p t h i s m a n u a l o n b o a r d 2022 EN U M...

Page 26: ...5 SH700 412 BA60 SH700 Tunnel thruster BA60 SH700 412 BA75 SH700 Tunnel thruster BA75 SH700 412 BA45 SH700 Tunnel thruster BA45 SH700 412 BA56 SH700 Tunnel thruster BA56 Archived SH1000 513 BA110 BRUK...

Page 27: ...lts with the thruster switch it off to avoid further damage The primary purpose of the thruster is to manoeuvre or dock the vessel Forward or reverse speed must not exceed 4 knots when operated For th...

Page 28: ...rn to move Joystick control panels For joystick control move the joystick in the direction you wish the bow stern to move NB If equipped for proportional control move the joystick equivalent to the am...

Page 29: ...Control panel example Control panel example Control panel example Bow and stern thruster installation Bow and stern thruster installation Activating the stern thruster Activating both bow and stern th...

Page 30: ...are fastened securely Clean the tunnel and gear leg from marine growth Paint the propeller and gear leg with anti fouling before every season to keep it clean from sea growth NB Never paint the anode...

Page 31: ...Propeller 7 Anode 8 Drive pin 9 Washer 10 Lock Nut 11 Fastening Screw for anode 12 Oil drain screw 13 Shaft Key 14 Anode pins 15 Locking Washer SH 100 160 240 SH 320 SH 420 550 SH 700 1000 1400 11 13...

Page 32: ...f necessary On counter rotating models ensure LH and RH propellers are installed correctly Install correctly Check the flexible coupling between the motor and drive shaft is tted correctly and not dam...

Page 33: ...area around the thruster is clean and dry If there are signs of water or oil leaks Paint the propeller and gear leg with anti fouling Batteries are in good condition All electrical connections are cl...

Page 34: ...rned to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding t...

Page 35: ...MC_0037 Notes 11 6572 4 2022 SH user manual...

Page 36: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Group cannot accept liability for any possible differences...

Reviews: