21
2746
28
2021
-
SH 100t & 160t
MC_0049
Checklist for Hydraulic Thrusters
�.......... Propeller is fastened correctly to the shaft.
�.......... Propeller turns freely in tunnel.
�.......... Lower-unit is fi lled with gear oil.
�..........
Oil-drain screw is tightened and the copper seal is present.
�.......... The anode holding screw is tightened well with thread glue.
�.......... Anti-fouling have been applied to the gear house and propeller but NOT on the anode or the
gear house lid where the propeller is fastened.
�.......... Oil tank is fi tted above the waterline as required and fi lled with gear oil.
�.......... Correct drive direction as per control panel.
�.......... The bolts holding the gear house and motor bracket together are tightened correctly.
�.......... The bolts holding the motor to its bracket are tightened correctly.
The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.
Signed: .........................................................................................
Date: .............................................................................................
Extra pre-delivery tests by installer / yard who does not use other quality control systems !
Thruster type: ................................................................................................................................................................................................
Serial number:...............................................................................................................................................................................................
Date of delivery:.............................................................................................................................................................................................
Correct drive direction as per control panel: ..................................................................................................................................................
The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding:
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
Other comments by installer: ........................................................................................................................................................................
.......................................................................................................................................................................................................................