background image

 21

5611

12

2021

-

SE20 & SE25 & SE30 & SE40

  

MG_0031

6 1265 5-LEAD 

Y-CONNECTOR

6 1265 5-LEAD 

Y-CONNECTOR

6 1278-xxM 5-LEAD 

CONTROL CABLE

6 1278-xxM 5-LEAD 

CONTROL CABLE

6 1278-xxM 5-LEAD 

CONTROL CABLE

6 1277-xxM 4-LEAD 

CONTROL CABLE

6 1277-xxM 4-LEAD 

CONTROL CABLE

STERN

BOW

STERN

BOW

STERN

6 1278-xxM 5-LEAD 

CONTROL CABLE

Switch

5A fuse

Switch

5A fuse

 

 Common negative

10A fuse

+

-

+

-

To define appropriate (-) cable 

and fuse size contact a skilled 

electrician

To define appropriate (-) cable 

and fuse size contact a skilled 

electrician

6 1274 4-LEAD 

Y-CONNEC TOR

STERN

BOW

STERN

BOW

STERN

xA fuse

6 1277-xxM 4-LEAD 

CONTRO L CABLE

6 1277-xxM 4-LEAD 

CONTRO L CABLE

6 1277-xxM 4-LEAD 

CONTRO L CABLE

6 1277-xxM 4-LEAD 

CONTRO L CABLE

6 1274 4-LEAD 

Y-CONNEC TOR

xA fuse

 

 Common negative

10A fuse

+

+

-

-

With Automatic Main Switch:

With Manual Main Switch:

IMPORTANT

Check the following with the main switch in the off position  

After all electrical connections have been completed check with an ohm meter that there is 

no electrical connection between electro motor body and positive terminal on the motor and 

between the electro motor body and the negative (A1) terminal on the motor. If you feel 

unsure about how to perform this check, contact skilled personnel for guidance

Common negative MUST be wired when using control panel 8940 and 8909C if separate 

battery banks are installed. (Bow and Stern thrusters combined)

Visual Wiring Diagram

EN

Control Panel Cable Installation

EN

•  

All Sleipner control panels can be used in any combination. 

•  

All control panels can be installed using:

 

• Y-connectors - for standard on/off 

• T-connectors - for S-link proportional power system. 

(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until 

it receives a single signal or thrust in one direction.)

• 

Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.

See the Control panel manual for more information.

MC_0041

!

 Please refer to the graphic for special considerations relating to your model 

!

MG_0024

Thruster

Motor

Ext. cable

4- or 5-lead

Y cable

4- or 5-lead

Ext. cable

4- or 5-lead

Option: Automatic main switch. connects the battery to 

the thruster. Operated from the control panel(s). 

Requires 5-lead control cables.

Summary of Contents for SE20/110

Page 1: ...Made in Norway Sleipner Motor AS 2021 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com Document id Revision Date Installation Guide 5611 12 SE 20 110 25 110 30 125 40 125 2021...

Page 2: ...ruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installation 13 Thruster Installation Instructions Considerations...

Page 3: ...he temperature switch is activated Do not store items close to the thruster motor Any loose items near the thruster motor is a potential re hazard and can cause undesired short circuiting It is the in...

Page 4: ...ngth 111 4 37 111 4 37 111 4 37 111 4 37 TL recommended Recommended tunnel length 133 5 24 133 5 24 136 5 35 136 5 35 WD Minimum water depth 110 4 33 110 4 33 125 4 92 125 4 92 H Motor Height 209 8 23...

Page 5: ...cools down Flexible coupling between electro motor and drive shaft protects electro motor and gear system if propeller jams Original Sleipner panels shut off automatically 6 minutes after last use Th...

Page 6: ...er as deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels durin...

Page 7: ...ot allow the variable length of the tunnel walls to vary in length excessively EG the top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the...

Page 8: ...stead t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thrust...

Page 9: ...t is angled slightly down because of the water flow on this area 2 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler...

Page 10: ...tunnel and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls an...

Page 11: ...cover the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass...

Page 12: ...tunnel installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible...

Page 13: ...0 SE25 SE30 SE40 Stern Tunnel Installation EN Stern thruster installation has extra considerations and precautions and thruster installation procedures See the attached manual supplied in the stern th...

Page 14: ...he temperature switch is activated Do not store items close to the thruster motor Any loose items near the thruster motor is a potential re hazard and can cause undesired short circuiting It is the in...

Page 15: ...te recommended to mark the hole centres and double check the measurements One hole MUST be placed using the boat centreline as shown above NB All holes must be in line with the tunnels centreline for...

Page 16: ...in the propeller 2 Insert the washer to the end of the shaft spline Fasten with the propeller lock nut 3 Apply anti fouling to the gear leg and propeller Do not apply anti fouling to any rubber eleme...

Page 17: ...top cap 4 Fasten the bolts holding the motor to the motor bracket with the above torque 5 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be hard due to the...

Page 18: ...AMP hours Ah for your speci c duty cycle 2 Use appropriate sized cables and batteries with high cranking capacity to feed the thruster The actual voltage at the motor while running the thruster decide...

Page 19: ...NA NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0...

Page 20: ...ronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug play and require no additional con guration setup Se...

Page 21: ...BLE 6 1277 xxM4 LEAD CONTRO L CABLE 6 1277 xxM4 LEAD CONTRO L CABLE 6 1277 xxM4 LEAD CONTRO L CABLE 6 12744 LEAD Y CONNEC TOR xA fuse Common negative 10A fuse With Automatic Main Switch With Manual Ma...

Page 22: ...Diagram EN 8 5 9 2 4 7 1 3 6 2 1 3 4 5 6 7 8 9 1 2 3 4 black black blue blue grey grey red red red brown Control box 6 1232i simplified IPC Interface Thruster Motor 9 way socket Control cable M C Cont...

Page 23: ...red black black blue grey red 9 way socket 1A PTC Control box 6 1232i simplified AMP connector 1 2 3 4 9 8 7 6 5 4 3 2 1 8 5 9 2 4 7 1 3 6 brown white blue grey red D1 thruster solenoid B A2 1 Timer...

Page 24: ...he control panel NB If the front surface around your cut out is jagged or chipped use a sealant to assist the gasket 3 Place the gasket to the back face of the panel 4 Plug cables into the connectors...

Page 25: ...e gear house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tigh...

Page 26: ...ation Manual have been complied with and that the defect remains e warranty service shall be performed only by the Warrantor or an authorized Service Centre and any attempt to remedy the defect by any...

Page 27: ...27 5611 12 2021 SE20 SE25 SE30 SE40 MC_0037 Notes EN...

Page 28: ...rect at the time it was published However Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain Continuous product improvement may change the product speci cation...

Reviews: