
20
5611
12
2021
-
SE20 & SE25 & SE30 & SE40
Control Panel Cable Installation
EN
•
All Sleipner control panels can be used in any combination.
•
All control panels can be installed using:
• Y-connectors - for standard on/off
• T-connectors - for S-link proportional power system.
(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until
it receives a single signal or thrust in one direction.)
•
Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.
See the Control panel manual for more information.
MC_0041
!
Please refer to the graphic for special considerations relating to your model
!
MG_0024
Thruster
Motor
Ext. cable
4- or 5-lead
Y cable
4- or 5-lead
Ext. cable
4- or 5-lead
Option: Automatic main switch. connects the battery to
the thruster. Operated from the control panel(s).
Requires 5-lead control cables.