18. Service Programmes
Service or calibration of this ventilator should only be carried out by an SLE trained
hospital engineer or an SLE service engineer.
To assist in checking operational use and service periods, the ventilator is fitted with a
time elapsed meter. Times should be noted when any service or major component
replacement is carried out on individual units.
6 MONTHLY PREVENTATIVE MAINTENANCE
Preventative maintenance should be completed at a maximum of every 6 monthls.
This maintenance is intended to be carried out in the hospital. Preventative
Maintenance will include:-
•
Visual inspection of and cleaning of all exterior surfaces, controls, attachments and
accessories.
•
Removing the covers and cleaning all dust from interior of the unit.
•
Visual inspection and replacement where necessary, of all tubing, electrical wiring,
connectors, crimps, screws, nuts, hardware and checking the general condition of
all other internal components and assemblies.
•
Inspection of the mains failure battery holder for corrosion and replacement of the
battery.
•
Pneumatic and Electronic testing and where necessary, calibration of ventilator.
•
A maintenance agreement is available. Contact your distributor for further details.
10,000 Hrs (24 MONTHLY) OVERHAUL
Overhaul should be carried out at a maximum of 10,000 hours operation or every two
years of service. This overhaul must be performed by an SLE trained hospital
engineer or an SLE service engineer.
In addition to the checks and items performed during the preventative maintenance,
an overhaul will include replacement of :-
•
Oxygen monitor cell
•
Oxygen blender
•
Main solenoid SV1
•
PIP and CPAP regulators
Summary of Contents for 2000
Page 1: ...Issue 11 SLE 2000 Ventilator User manual Infant Ventilator ...
Page 15: ...Page 15 of 66 ...
Page 30: ...Page 30 of 66 This page is intentionally blank ...
Page 31: ...Page 31 of 66 ...
Page 66: ...0120 ...