15
Now, working in a
clockwise direction
, attach all of the
remaining gold
springs.
Make sure the V-rings and frame holes line up correctly.
(Remember, you’re the boss here. You tell those springs what to do! And
other people if they’re helping...)
STEP 15
10
Lay the two halves of the frame pad
(12)
on the frame. Make sure to line the
pad up with the frame so the slits sit over the sockets.
Then, connect the two pieces of padding together with the velcro.
STEP 16
12
Frame Pad
(x2 Pieces)
Gold Spring
(x40)