background image

Page 16

SkyVision Linx 300 Pre-Install • REV2

2-9.  Network

a.   Network Drops and Required Ports

Up to eight (8) Static IP network drops are required for the following components (if installed), to enable 

full system function, configuration, and diagnostics.  

Required or 

w/Option

Device

Lan Drop 

Location

TCP Ports 

Required

UDP Ports 

Required

Notes

Required

Primary 

Touch Panel

Touch Panel

22

SVIS-AUD

Audio DSP 

(Nexia)

Rack

12001

12000

SVIS-DCSS

DCSS

Rack

21, 22, 80, 443, 

554, 3306, 

(10000 - 10400 

and 11000 - 

11400 are only 

for DCSS ot 

DCSS streams)

6970 

through 

6999

For DCSS to DCSS (room 

to room) streaming, the 

network mus pass multicast 

addresses in the range of 

239.192.0.0 to 239.193.0.0

SVIS-OBC

PC1

Rack unless 

hospital provided 

and not at rack

Standard

SVIS-OBC

PC2

Rack unless 

hospital provided 

and not at rack

Standard

SVIS-OBC

PC3

Rack unless 

hospital provided 

and not at rack

Standard

w/ hospital 

provided 

Network 

Printer

Network 

Printer

Printer Location

Standard

b.   Analog Phone Line Drop

One anlog phone line is required for the audio conference option

Required or w/Option

Device

Drop Location

SVIS-AUD

Audio DSP (Nexia)

Rack

Summary of Contents for Linx 300

Page 1: ...Pre Installation Manual SkyVision Linx 300 Integration Control System TEC R 0049 REV2 08 05 2015 ...

Page 2: ...ons must be from the base language document Printed copies are not controlled documents Although current at the time of publication SKYTRON S policy of continuous development makes this manual subject to change without notice If current manuals are required contact your local SKYTRON representative or contact SKYTRON directly at the distribution addresses listed above ...

Page 3: ... 1 Environmental 4 2 2 Power 4 2 3 Grounding 4 2 4 Rack Mounting 5 2 5 Display Power Management 10 2 6 Optional Equipment 10 2 7 Remote Rack Locations 11 2 8 Connections 12 2 9 Network 16 SECTION 3 Installation RESPONSIBILITIES 18 3 1 SKYTRON Responsibilities 18 3 2 Customer Responsibilities 18 SECTION 4 REVISION HISTORY 23 ...

Page 4: ...Page 2 SkyVision Linx 300 Pre Install REV2 ...

Page 5: ... Manual provides an overview of typical installation considerations and specific installation requirements associated with a SkyVision system Only SKYTRON certified technicians are authorized to install a system The SkyVision installation team may consist of two 2 or more technicians who coordinate with the hospital staff and local subcontractors to complete an installation Technicians follow spec...

Page 6: ...rmance reliability and longevity 2 2 Power The SKYTRON Linx 300 System requires two 2 120VAC 20A GFCI protected outlets One circuit is dedicated to the component rack and the second circuit is dedicated to the monitor power supplies All receptacle outlet strips adapters receptacle covers and faceplates shall be marked with the following words or equivalent WARNING TECHNICAL POWER DO NOT connect to...

Page 7: ... Weight Capacity Minimum Structural Requirements Mounting Hole Spacing 23 3 8 594mm 38 1 2 978mm 26 5 16 668mm 250 lbs 500 lbs 16 406mm Minimum Clearance 6 from non hinged side 20 from hinged side 4 on top and bottom NOTICE It is the responsibility of the contractor to provide sufficient backing studs in the wall to support the rack the rack does NOT stand on the floor An alternative to mounting d...

Page 8: ... 2 20 MIN CLEARANCE 90 90 4 MOUNTING HOLE LOCATIONS A B x B C D D E E F F G G J H H B K L I Letter Dimension A 38 1 2 B 12 1 2 C 22 3 4 D 1 3 8 E 16 F 5 3 8 G 2 11 16 H 13 I 4 J 33 1 4 K 5 7 8 L 4 3 8 B CONDUIT BOXES RACK Figure 1 Rack Mounting and Junction Box Location Left Hand Swing Cabinet ...

Page 9: ...WALL 20 1 2 90 90 26 5 16 4 MOUNTING HOLE LOCATIONS A B x B C D E G G H H B I J K L D E F Letter Dimension A 38 1 2 B 12 1 2 C 22 3 4 D 1 3 8 E 16 F 5 3 8 G 2 11 16 H 13 I 4 J 33 1 4 K 5 7 8 L 4 3 8 RACK CONDUIT BOXES B F Figure 2 Rack Mounting and Junction Box Location Righ Hand Swing Cabinet ...

Page 10: ...e Install REV2 12 x 12 x 4 JUNCTION BOX PROVIDED BY CUSTOMER TO BE ROUGHED IN BY THE CONTRACTOR MOUNT THE POWER OUTLETS IN BOX AS SHOWN 10 AWG GREEN STRANDED WIRE Figure 3 Left Hand Swing Installation with Junction Box Termination ...

Page 11: ... minimum 50 cfm HVAC ventilation system MOUNT POWER OUTLETS AS SHOWN REAR CABINET TO CABINET CONNECTIONS REQUIRE 15 FOOT LONG CABLES CENTER OF 12 X 12 X 4 JUNCTION BOX IS LOCATED 12 IN FROM THE SIDE AND 15 UP FROM THE FLOOR IF THE JUNCTION BOX MUST BE LOCATEDD ON THIS SIDE THE CONTENTS OF EACH RACK MUST BE SWITCHED THE CONDUITS MUST EXIT AT THE DIGITAL MATRIX SWITCH 50 CFM HVAC VENTILATION AIR SYS...

Page 12: ...he minimum size NEMA 4 enclosure for each power supply is 14 L x 12 W x 7 H L Com Global Connectivity Model NB1207 10FS UL or equivalent Appropriate power supplies and cables required for displays not provided by SKYTRON must be provided by the equipment vendor to meet the specific needs of the display location Not all displays use low voltage power supplies Larger displays typically 32 and above ...

Page 13: ...e keyboard and mouse to control up to four 4 PCs or one DCSS and three 3 PCs When a DCSS is purchased in addition to the on board PC the KM Switch must be quoted If the hospital uses their PCs instead of purchasing the SkyVision PCs they may use their keyboard and mouse instead of the SkyVision keyboard and mouse The hospital computer can be placed anywhere in the room with their keyboard mouse an...

Page 14: ...t carriers or in double gang electrical wall boxes Figure 6 depending on the location of the source The conversion faceplates convert a copper wire signal digital or analog to a fiber optic digital signal Low voltage power lines are the only other type of connection utilized to and from the SkyVision system Copper wiring is only employed between components at the rear of the SkyVision control rack...

Page 15: ...Page 13 SkyVision Linx 300 Pre Install REV2 4 x 4 x 3 1 2 DEEP DOUBLE GANG ELECTRICAL WALL BOX RACO MODEL 256 OR EQUIVALENT GARVIN 52181 S RAC0 256 SINGLE GANG MUD RING Figure 6 Electrical Boxes ...

Page 16: ...cords to support 500 lbs of load Mounting hardware supplied by others to meet support requirements FINAL PLACEMENT OF REQUIRED CONDUIT IS THE RESPONSIBILITY OF AND DETERMINED BY THE ARCHITECT ACME HOSPITAL PROJECT XX 123 XX FABRICATION PLOT DATE ROOM TYPE GEN OR REV 1 EQUIPMENT SCHEDULE ID DESCRIPTION A EQUIPMENT BOOM WITH LIGHTS B UTILITY MONITOR BOOM C ANESTHESIA BOOM IN THE EVENT THAT FIXTURE L...

Page 17: ...RING 12 BELOW FINISHED CEILING NETWORK 8 CEILING MOUNTED EQUIPMENT 2 DESCRIPTION OF MOUNT PER EQUIPMENT MANUFACTURER MOUNT ID RACK 9 WALL DISPLAY 1 WALL DISPLAY 4 SQ X 3 5 DEEP BOX W 1 GANG P RING 60 ABOVE FINISHED FLOOR RACK 10 AUDIO PACKAGE 3 8 FLEX CEILING SPEAKERS TERMINATES TO SPEAKERS PER INSTRUCTIONS FINISHED CEILING PER HOSPITAL RACK 11 MICROPHONE 3 8 FLEX MICROPHONE STUB OUT FINISHED CEIL...

Page 18: ...554 3306 10000 10400 and 11000 11400 are only for DCSS ot DCSS streams 6970 through 6999 For DCSS to DCSS room to room streaming the network mus pass multicast addresses in the range of 239 192 0 0 to 239 193 0 0 SVIS OBC PC1 Rack unless hospital provided and not at rack Standard SVIS OBC PC2 Rack unless hospital provided and not at rack Standard SVIS OBC PC3 Rack unless hospital provided and not ...

Page 19: ...gh quality video Capture Resolution Minimum Bit Rate Required Frame Rate Recording GB Hr DVD Capacity DVD Burn Time per hr of video 640x480 VGA 768 Kb s 30 fps 0 33 720 min 1 min 46 sec 800x600 SVGA 1500 Kb s 30 fps 0 66 415 min 2 min 10 sec 1024x768 XGA 3000 Kb s 30 fps 1 32 215 min 3 min 9 sec 720p 3500 Kb s 30 fps 1 53 188 min 3 min 25 sec 1280x1024 SXGA 4000 Kb s 30 fps 1 75 160 min 3 min 42 s...

Page 20: ... Installation will include mounting the SkyVision rack if necessary 3 2 Customer Responsibilities 1 Customer will provide SKYTRON with the appropriate room drawings to include plan electrical and mechanical drawings 2 Customer will be responsible for supply and installation of all conduit and electrical junction boxes 3 Customer will provide proper HVAC ventilation of NDC compatible with system re...

Page 21: ...tallation may occur and result in additional daily charges of 1900 00 per day per technician to be added to the final invoice If return trips are necessary due to lack of customer suppled equipment additional charges may occur 13 Customerwillassignadesignatedrepresentativetocoordinateinstallationschedulesandapprove the SkyVision installation within ten 10 days of completion of work Customer repres...

Page 22: ...ON VERIFICATION ARE SUBJECT TO BILLING Environmental Considerations Do installed Conduit Runs match drawings in both sizing and locations Yes or no Are any conduit runs missing changed or different from the submittal drawings Yes or no Are the Nurse Document Centers installed and placed in their final location Yes or no Is there a 12 x 12 box for conduit termination installed at the NDC or Rack loca...

Page 23: ...pecial or custom equipment the installer s may not be familiar with Yes or no Are all customer provided systems and equipment in place and in working order Yes or no Are non Skytron supplied displays on site Yes or no Have proper power supplies been provided for non Skytron displays Yes or no Are proper mounts or adapters provided for monitors Yes or no RETURN VISITS DUE TO INACCURATE INCOMPLETE I...

Page 24: ...Page 22 SkyVision Linx 300 Pre Install REV2 FDA 0900 36 REV0 Page 3 of 3 Are there any changes or additions not addressed by this list Notes S a m p l e F o r R e f e r e n c e O n l y ...

Page 25: ...y Page 4 added additional specification on 10 AWG copper ground wire Page 10 changed DCSS to SVIS DCSS as a clarification Page 11 and 16 changed VIS to SVIS in several places as a correction Page 18 changed dedicated and isolated electrical supply to GFCI protected electrical supply in Section 3 2 Customer Responsibilities 08 05 2015 2 Corrected the REV number from TEC R 0047 to TEC R 0049 ...

Page 26: ...Page 24 SkyVision Linx 300 Pre Install REV2 NOTES ...

Page 27: ...Page 25 SkyVision Linx 300 Pre Install REV2 NOTES ...

Page 28: ...5085 Corporate Exchange Blvd S E Grand Rapids MI 49512 616 656 2900 FAX 616 656 2906 ...

Reviews: