EQUIPMENT INSTALLATION INTO PC21
P-20
Assembly & Operation Manual
Equipment installation is a personal venture. There is one golden rule: Do it as neat
and logical as possible! This will make fault finding and service of components eas-
ier. The pc21 basically consist of 7 circuits!
1. Servo wires
2. Power cables
3. Data cables
4. Pneumatic pipes
5. Air pipes
6. Fuel pipes
7. RX cable / Satellite Receivers
Please try and separate these circuits as far as possible. It is advisable not to run RX
cables near any kind of electrical fields. Make all switches and filler valves and charg-
ing sockets easy accessible. If you use S-bus technology it will simplify installation.
.
Photo 32
Photo 34
Photo 33