Telescopic Boom Series
Models SJ61T & SJ66T
194312
Section 5 - Procedures
Service and Maintenance
Mid Boom Section Installation
Procedure:
1.
Attach two lifting slings to the mid boom. Using
suitable lifting equipment, slide the mid boom
section slowly into the platform end of the main
boom. Be careful not to damage the wear pads.
2. When it is about
1/3
of the way in, install the bottom
wear pad. Apply Loctite 242 or 243 to the wear
pad fasteners.
3.
Place a suitable stand under the end of the boom.
Lower it onto the stand and remove one lifting
sling.
4. Continue sliding the boom all the way in until the
holes in the mid boom nose and the cable/hose
tube support line up.
5. Install the top and side wear pads and shims in the
main boom nose. Apply Loctite 242 or 243 to the
fasteners.
6.
Install the main power track carrier bolt. Remove
the blocking and strap supporting the cable/hose
tube.
M62061AA
7.
Remove the tape from the limit switch hole.
M62200AA
Limit Switch Hole
Summary of Contents for SJ61T
Page 1: ...TELESCOPIC BOOMS MODELS SJ61T SJ66T 194312AE February 2017 SERVICE MANUAL...
Page 42: ...Page 42 December 2007 Telescopic Boom Series Models SJ61T SJ66T 194312 Notes...
Page 230: ...Page 230 December 2007 Telescopic Boom Series Models SJ61T SJ66T 194312 Notes...
Page 231: ......
Page 232: ...www skyjack com P litelig lift l sninger av folk som bryr seg...